【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
ABC
解析
暂无解析
相关试题
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
推荐试题
【多选题】
为维护正常经济税收秩序,优化营商环境,税务总局2018年决定开展打击发票违法犯罪专项工作。该专项工作主要打击的行为有___。
A. 制售非法发票
B. 善意获取非法发票
C. 虚开增值税发票
D. 骗取出口退税
E. 重大偷逃税
【多选题】
税务总局提出深化税收征管体制改革要打赢三场主攻战。这三场主攻战包括___。
A. 新税务机构挂牌
B. 制定落实“三定”规定
C. 社保费和非税收入征管职责划转
D. 配好各级班子成员
E. 促进经济增长
【多选题】
中央将省级和省级以下国税地税机构合并,并由新机构具体承担所辖区域内各项税收、非税收入征管等职责。这项改革的主要目的包括___。
A. 降低征纳成本
B. 保证中央收入任务
C. 理顺职责关系
D. 优化税制结构
E. 为纳税人提供更加优质高效便利服务
【多选题】
为了进一步简化企业清税手续,税务部门推出了“承诺制”清税,对符合一定条件的纳税人采取容缺办理。下列选项中,属于上述“符合一定条件”情形的纳税人有___。
A. 纳税信用级别为A级的某重点税源企业
B. 法定代表人在异地存在非正常户的企业
C. 增值税月核定2万元的小规模纳税人
D. 连续十二个月零申报的小规模纳税人
E. 地方政府引入的外商投资企业
【多选题】
根据国税地税征管体制改革工作部署,在改革过渡期,各级税务机关对办税服务资源和网上办税系统进行有效整合。下列属于新税务机构挂牌后,符合“办税统一”的相关要求有___。
A. 一厅通办
B. 一网通办
C. 一键咨询
D. 主税附加税分次办
E. 开展分头进户执法
【多选题】
根据中央关于国税地税征管体制改革的统一部署,深化国税地税机构改革有必要做到税务系统的“四合”。下列选项中,属于“四合”内容的是___。
A. 事合
B. 力合
C. 人合
D. 物合
E. 心合
【多选题】
为营造稳定公平透明、可预期的营商环境,税务总局要求深入开展税务稽查分类处理,需要支持的对象有___。
A. 新产业
B. 新业态
C. 初创企业
D. 实体企业
E. 守信企业
【多选题】
为有效推进国税地税机构改革方案落地,税务总局制定并实施了税务系统机构改革“七个阶段”内容。下列选项中,属于税务系统机构改革“七个阶段”内容的有___。
A. 统一思想保稳定
B. 顶层设计定方案
C. 动员部署鼓干劲
D. 改好县局树样板
E. 总结经验找差距
【多选题】
某有限责任公司领取了“多证合一”营业执照。下列选项中,属于需要到税务机关办理的业务有___。
A. 领取税务登记证
B. 变更办税员姓名
C. 变更核算方式
D. 办理清税手续
E. 注销社保登记
【多选题】
深化国税地税征管体制改革的目的是为了更好地发挥税收在国家治理中的重要作用。下列选项中,属于税收在国家治理中作用的有___。
A. 基础性
B. 宏观性
C. 支柱性
D. 保障性
E. 系统性
【多选题】
为贯彻落实国务院关于深化“放管服”改革,国务院办公厅印发了关于加快推进“五证合一、一照一码”登记制度改革的通知。下列属于“五证合一、一照一码”的证照有___。
A. 税务登记证
B. 卫生许可证
C. 工商营业执照
D. 社会保险登记证
E. 安全生产许可证
【多选题】
税务稽查人员对所查某公司开具给他人的收款收据进行了复印,以证明纳税人取得了相应的销售收入。该复印件属于___。
A. 原始证据
B. 传来证据
C. 直接证据
D. 间接证据
E. 证言证词
【多选题】
转变税收征管方式是税务系统一场广泛而深刻的变革。下列关于转变税收征管方式的说法正确的有___。
A. 以纳税信用管理为前提
B. 以分类分级管理为基础
C. 以现代信息技术为依托
D. 以税收风险管理为导向
E. 以营商环境排名为目标
【多选题】
国税地税征管体制改革要求强化经费保障和资产管理。下列选项中,税务部门经费保障体制的内容是___。
A. 中央财政为主
B. 中央财政为辅
C. 地方财政为主
D. 地方财政为辅
E. 中央地方财政均摊
【多选题】
国税地税征管体制改革进程应该遵循一定的顺序。下列选项中,改革顺序表述正确的有___。
A. 先各级新税务机构挂牌,再落实“三定”规定
B. 先合并国税地税机构,再接收社保费和非税收入征管职责
C. 先把县局改革做稳妥,再扎实推进市局层面改革
D. 先把市局改革做稳妥,再扎实推进省局层面改革
E. 先把省局改革做稳妥,再扎实推进市局、县局改革
【多选题】
新办纳税人张某享受了“套餐式”服务。下列属于“套餐式”服务的涉税事项有___。
A. 实名办税
B. 实地核查
C. 登记信息确认
D. 网上办税服务厅开户
E. 企业所得税优惠备案
【多选题】
2018年11月16日,税务总局印发了《关于实施进一步支持和服务民营经济发展若干措施的通知》,其中涉及精简压缩办税资料的措施有___
A. 2018年底前,税务总局再取消20项涉税证明事项
B. 2019年,对民营企业等纳税人向税务机关报送的资料再精简75%以上
C. 2019年,简并优化增值税、消费税等纳税申报表
D. 2019年,推进实施增值税申报“一表集成”、消费税“一键申报
E. 2019年,结合国税地税征管体制改革,开展新一轮大调研大走访活动
【多选题】
构建优化高效统一的税收征管体系是国税地税征管体制改革的重要内容。下列选项中,属于优化高效统一的税收征管体系的内容是___。
A. 优化税务机构职能和资源配置
B. 构建稳固强大的信息化支撑体系
C. 建立专门化的大数据管理机构
D. 完善税费征管服务的运行机制
E. 提升税收收入在GDP中的比重
【多选题】
下列选项中,属于税务系统贯彻落实双重领导管理体制内容的是___。
A. 切实担好“为主”的责任
B. 切实担好“为辅”的责任
C. 主动落实好“双重”的要求
D. 积极争取地方的大力支持
E. 积极争取中央的大力支持
【多选题】
税务稽查人员在实施税务检查时,应当回避的情形有___。
A. 稽查人员的妻子是被查单位的会计人员
B. 稽查人员同学的表舅是被查单位保安人员
C. 稽查人员的岳父是被查单位的总经理
D. 稽查人员的弟弟是被查单位的法定代表人
E. 稽查人员舅舅的同学是被查单位的驾驶员
【多选题】
税务总局决定从2018年10月开始按照自查自纠、督促纠正、重点检查、总结完善等步骤,逐步推进规范影视行业税收秩序工作。下列说法正确的是___。
A. 企业在2018年11月20日主动到税务机构补缴税款,可免予行政处罚
B. 企业主动进行自我纠正,可依法从轻或减轻行政处罚
C. 企业经税务机关多次提醒后拒不纠正,税务机关要对其开展重点检查
D. 税务机关应当依法为纳税人、扣缴义务人的情况保密
E. 税务机关应当及时回应社会关切,主导社会舆论
【多选题】
一定情形下,检查暂时无法进行,检查部门可以填制《税收违法案件中止检查审批表》,附相关证据材料,经稽查局局长批准后,中止检查。下列各项中,符合上述“一定情形”的有___
A. 当事人王某被公安机关依法拘留
B. 被查单位会计老刘出差,无法调取账簿
C. 被查单位的账簿被审计机关调取尚未归还
D. 主查人员小刘接到另外的紧急任务,未进行交接
E. 当事人陈某拒不配合检查
【多选题】
2018年底前,国家税务总局将在全国范围内建成规范统一的电子税务局,实现“四个统一”。这“四个统一”具体包括___
A. 界面标准统一
B. 业务标准统一
C. 数据标准统一
D. 登录地址统一
E. 关键创新事项统一
【多选题】
税务系统机构改革后,全系统稽查序列包括以下机构___
A. 国家税务总局稽查局
B. 各省级局稽查局
C. 各市级局稽查局
D. 各市级局所属跨区稽查局
E. 各县级局稽查局
【多选题】
为严格规范税收执法,保障民营企业合法权益,各级税务机关在实施税务检查中,必须做到民营企业与其他企业一视同仁,应当坚持的原则有___
A. 无风险不检查
B. 无审批不进户
C. 无违法不停票
D. 无异常不核实
E. 无举报不立案
【多选题】
2018年10月1日以后,对向市场监管部门申请简易注销的纳税人,办理注销登记时无需到税务机关办理清税证明的情形是___
A. 未办理过涉税事宜
B. 未纳入纳税信用级别评价的定期定额个体工商户
C. 领用过发票但未实际开具过
D. 办理过涉税事宜但未领用发票、无欠税(滞纳金)及罚款
E. 已经不再继续经营,且无任何资产
【多选题】
税收征管方式的“四个转变”是指___
A. 事前审核向事中事后监管转变
B. 固定管户向分类分级管户转变
C. 无差别管理向风险管理转变
D. 经验管理向大数据管理转变
E. 固定管户向行业管理转变
【多选题】
国税地税征管体制改革过渡期间,新的税务机构挂牌后,以下的业务办理表述正确的是___
A. 税务机关要实现 “一厅通办”“一网通办”“主税附加税一次办”,涉税业务“一键咨询”
B. 涉及原国税、地税机关的税务行政复议、行政诉讼、国家赔偿等职责继续由原机构承担
C. 对承接的原国税、地税机关受理的行政许可事项以及新受理的行政许可事项按时办结,确保整体审批时限不超过法定办结时限
D. 纳税人、扣缴义务人按规定需要向原国税、地税机关分别报送资料的,相同资料只需提供一套,同一事项只需申请一次
E. 12366纳税服务热线仍然区分国税、地税业务接待纳税人的咨询,管户调整全部到位,做到税费统征统管
【多选题】
国税地税征管体制改革的主要目标包括___
A. 逐步构建起优化高效统一的税收征管体系
B. 为纳税人和缴费人提供更加优质高效便利服务,提高税法遵从度和社会满意度
C. 提高征管效率,降低征纳成本,增强税费治理能力,确保税收职能作用充分发挥
D. 推进国家治理体系和治理能力现化代
E. 持续提高税收占GDP的比重
【多选题】
某新办企业办税人员首次向主管税务机关申领增值税发票,并希望在申请后2个工作日内及时领到发票,则该企业及办税人员需满足的条件有___
A. 该企业的办税人员已经进行实名信息采集和验证
B. 该企业的法定代表人已经进行实名信息采集和验证
C. 该企业的财务负责人已经进行实名信息采集和验证
D. 该企业有开具增值税发票需求,主动申领发票
E. 该企业按照规定办理税控设备发行等事项
【多选题】
改革国税地税征管体制,有利于构建优化高效统一的税收征管体系,更好发挥税收在国家治理中的作用。这些作用包括___
A. 基础性
B. 支柱性
C. 指导性
D. 保障性
E. 主导性
【多选题】
自2018年起施行的税收法律有___
A. 中华人民共和国烟叶税法
B. 中华人民共和国车辆购置税法
C. 中华人民共和国环境保护税法
D. 中华人民共和国船舶吨税法
E. 中华人民共和国车船使用税法
【多选题】
向市场监管部门申请简易注销的纳税人,符合一定条件,可免予到税务机关办理清税证明。下列选项中,属于上述“符合一定条件”的纳税人有___
A. 办理“多证合一”登记后,未到税务机关进行相关信息确认的A公司
B. 领购了发票未开具,一直零申报的B公司
C. 刚办理了新办纳税人套餐,未领发票,也未申报的C公司
D. 纳税信用级别为A级,已缴销发票,也无其他未办结事项的D公司
E. 因长期零申报被作为风险重点监控对象的E公司
【多选题】
简化税务注销办理的资料和流程,包括___
A. 实行网上受理
B. 开设专门窗口
C. 提供“套餐式”服务
D. 强化“首问责任制”和“一次性告知”
E. 优化内部工作流程和岗责分配