【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ABC
解析
暂无解析
相关试题
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
推荐试题
【单选题】
【企业清单编制平台】中,针对投标方导入的招标清单不能进行()操作? ___
A. 清单顺序的修改
B. 增补清单
C. 自主设置取费
D. 快速复用组价
【单选题】
【企业清单编制平台】暂不支持()业务工程的编制? ___
A. 招标清单
B. 招标控制价
C. 投标报价
D. 结算
【单选题】
【企业清单编制平台】不属于编制模块的界面是()? ___
A. 项目组成
B. 综合单价组成
C. 分部分项清单
D. 费用汇总
【单选题】
【企业清单编制平台】编制模块暂不支持的业务有()? ___
A. 相同清单快速组价
B. 信息价的载入
C. 多个楼栋工程量的插入
D. 综合单价为0的检查
【单选题】
《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中,新增单项脚手架在不同位置区分计算起始高度的要求,在云计量软件应对中将如何处理? ___
A. 通过在建筑面积构件中套取做法出量
B. 软件将新增单项脚手架的代码进行出量
C. 软件将新增脚手架构件,通过绘图出量
D. 暂无应对方案
【单选题】
《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中,沟槽、地坑的划分,正确的是? ___
A. 底宽≤7m、且底长>7 倍底宽为沟槽;
B. 底长≤3 倍底宽、且底面积≤20m2为地坑
C. 底宽≤7m,底长>3倍底宽为沟槽;
D. 底长≤3倍底宽,底面积≤150m²为地坑
【单选题】
《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中,关于矩形梁的计算规则,错误的是? ___
A. 梁上部有与梁一起浇筑的现浇板时,梁高算至现浇板顶。
B. 伸入墙内的梁头、梁垫并入梁体积内。
C. 按设计图示截面面积乘以梁长以体积计算。
D. 型钢混凝土梁需扣除构件内型钢体积。
【单选题】
下列哪项不是《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中增加的新工艺? ___
A. 装配式结构
B. 独立基础
C. 空心楼盖
D. 保温板墙
【单选题】
《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中,塑钢门的计量单位是? ___
A. 扇
B. 樘
C. 套
D. ㎡
【单选题】
《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中,沉管灌注桩的计量单位是? ___
A. m
B. ㎡
C. m³
D. 根
【单选题】
下列列项变化描述,错误的是? ___
A. 独立桩承台按独立基础项目编码列项
B. 基础圈梁按基础联系梁项目编码列项
C. 加腋梁按矩形梁列项
D. 箱式满堂基础仅底板按满堂基础项目列项
【单选题】
《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中,模板的计量单位是? ___
A. m³
B. ㎡
C. 项
D. 模板并入混凝土内,无需单独计算
【单选题】
《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中,关于构造柱高度的描述,正确的是? ___
A. 自其生根构件的上表面算至其锚固构件的下表面。
B. 按层高计算
C. 自层顶算至梁顶
D. 按自然层高度计算
【单选题】
《房屋建筑与装饰工程工程量计算规范》(征求意见稿)中,关于附墙柱计算规则的描述,正确的是? ___
A. 柱双面凸出墙面时,柱、墙分别计算,柱凸出部分并入墙体积内。
B. 柱单面凸出小于墙厚时,墙算至柱侧面
C. 柱单面凸出小于墙厚时,柱凸出部分并入墙体积内。  
D. 柱单面凸出大于于墙厚时,柱凸出部分并入墙体积内。
【单选题】
广材网的价格来自于 ___
A. 当地建材市场
B. 友商数据共享
C. 合作厂商报价
D. 用户单位合格供方推荐
【单选题】
广材网二级筛选栏能查看近几年的历史价 ___
A. 1年
B. 2年
C. 3年
D. 4年
【单选题】
广材助手不能实现的功能是以下哪一项? ___
A. 加入个人价格库
B. 批量载价
C. 清除载价信息
D. 智能比价
【单选题】
广材助手数据包导出后的格式是什么? ___
A. jbk
B. exe
C. sjb
D. gcj
【单选题】
广材助手与计价软件实现无缝链接,用户在预算文件编制、审核过程中,可通过什么方法同时使用数据包中的三类价格,节省调价工作时间。 ___
A. 单条载价
B. 批量载价
C. 导入全部离线数据包
D. 匹配定额编码
【单选题】
关于广材网盖章报价单说法正确的是 ___
A. 供应商原始报价
B. vip会员可不限次数下载
C. 可作为报价依据
D. 以上全部正确
【单选题】
下列功能中,广材网信息价栏目不能提供的是 ___
A. 本地信息价查询
B. 往期信息价格查询
C. 多价格对比
D. 按照材料名称进行搜索
【单选题】
关于智能比价说法错误的是 ___
A. 土建专业主要材料
B. 装饰专业主要材料
C. 全部辅材
D. 安装专业主要材料
【单选题】
广材助手中的市场价的来源是? ___
A. 政府发布的指导价
B. 优选供应商提供的价格
C. 专家用户测算的价格
D. 以上都是
【单选题】
广材助手中在哪可以查询平均价? ___
A. 市场价页签
B. 专业测定价页签
C. 信息价页签
D. 广材网页签
【单选题】
专业测定价专门针对定额材料进行制作,定额材料覆盖率达 ___
A. 70%
B. 80%
C. 90%
D. 1
【单选题】
广材网的钢材价格行情的更新频率是? ___
A. 每小时
B. 每日
C. 每两天
D. 每周
【单选题】
广材网在线客服的响应时间是多久? ___
A. 15秒
B. 30秒
C. 1分钟
D. 2分钟
【单选题】
广材人工询价服务覆盖区域 ___
A. 北京、上海、广东
B. 一线城市
C. 全国
【单选题】
每条非标准材料询价扣除多少人工询价服务条数 ___
A. 1条
B. 2条
C. 3条
D. 5条
【单选题】
以下哪个不是大客户专属询价服务? ___
A. 24小时内回复
B. 专人对接服务
C. 图纸/附件/清单询价
D. 提供询价报告
E. 多价格参考
【单选题】
以下那个不是广材产品老价值点? ___
A. 价格查询
B. 价格行情
C. 人工询价
D. 价格指数
E. 数据包载价
【单选题】
广材网信息价搜索,结果页面涵盖哪些材料价格? ___
A. 该材料当期价格
B. 该材料历史价格
C. 当期全部材料的信息价
D. 以上全部
【单选题】
在广材网如何发布人工询价? ___
A. 直接给供应商打电话
B. 在广材网人工询价栏目发布询价
C. 发送表格与询价师询价
D. 把材料发给广材网客服
【单选题】
广材网的搜索功能,主要是通过同材料快速比价来更便捷的搜索到想要的材料价格,具体可以实现以下哪些功能? ___
A. 同材料提供3家以上不同供应商的材料报价
B. 同材料不同型号快速对比
C. 可以直接选择材料参数及品牌
D. 以上全部
【单选题】
指标神器产品的定价是 ___
A. 800
B. 800/节点
C. 999/节点/年
D. 800/节点/年
【单选题】
以下不是指标神器产品核心功能的是 ___
A. 导入计价软件计算指标结果
B. 多种指标数据对比
C. 查询全国各地的指标结果数据
D. 自定义指标结果模板
【单选题】
指标神器目前不能支持的格式是 ___
A. GBQ4
B. GCCP5
C. XML
D. 友商计价软件
【单选题】
企业造价数据管理服务的主要目标客户群体 ___
A. 造价员
B. 造价主管
C. 成本经理
D. 企业老总
【单选题】
以下哪种不属于企业材料数据管理服务的核心用户群体是 ___
A. 重视数据有长期固定业务的咨询企业
B. 成本管理涉及材料的甲方;询价多的甲方
C. 投标业务量较多的企业,洽商变更多临近结算的项目部
D. 大型设计院
【单选题】
以下哪项不属于企业材料数据管理服务给企业带来的直接实施收益 ___
A. 有效的帮助企业沉淀项目经验数据
B. 在项目经验数据的基础上进行分析和外部数据引入提升成本控制能力
C. 组织询价效率提升20%
D. 能帮助获得更多收入