【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AB
解析
暂无解析
相关试题
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【单选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【多选题】
马克思主义哲学所讲的静止是指___
A. 运动的一种特殊形式
B. 绝对不动
C. 排斥运动
D. 事物处于量变状态
E. 事物在特定参考系中未发生位置变动
【多选题】
物质和运动的关系是___
A. 运动是物质的固有属性
B. 物质是运动的承担者
C. 运动是物质的存在方式
D. 运动不一定是物质的运动
E. 物质不一定都在运动
【多选题】
社会的物质性体现在___
A. 劳动是社会产生和存在的决定性因素
B. 在社会中不存在精神的现象和活动
C. 物质资料的产生是社会历史的前提
D. 全部社会生活在本质上是实践的
E. 社会生活中不存在物质关系以外的其他关系
【多选题】
意识的能动作用表现在___
A. 反映客观世界
B. 创造物质世界
C. 通过实践改造客观世界
D. 创造理论体系
E. 为自然界创造秩序
【多选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【多选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【多选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【多选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【判断题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 对
B. 错
【判断题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 对
B. 错
【判断题】
而非热舞法国会开绿灯技术的()
A. 对
B. 错
【判断题】
十大富豪不给发货返回返回返回()
A. 对
B. 错
推荐试题
【单选题】
在规划阶段制定供方选择标准, 其主要目的是 ( )。
A. 选择指定的供应商
B. 方便评标时专家打分
C. 确保选出能提供最佳所需服务的卖方建议书
D. 满足客户的期望
【单选题】
以下都是卖方绩效评估文件的作用, 除了( )。
A. 作为终止合同的依据
B. 为组织扩充合格卖方清单
C. 确认是否让卖方承接未来的项目
D. 作为卖方向买方索赔的依据
【单选题】
在不同的应用领域, 以下这些都可以被称作协议, 除了 ( }。
A. 合同
B. 订购单
C. 谅解备忘录
D. 要约
【单选题】
本项目采用成本加激励费用 (CPIF ) 合同, 目标成本是 20 万元, 目标费用为 3 万元, 最高费用 4 万元, 最低费用 1.8 万元, 成本分担比例为 80/20, 项目完工时实际成本为 2S 万元。 向卖方应支付的激励费用及总费用应该是多少? ( )
A. 3 万元, 28 万元
B. 18 万元, 26_ 8 万元
C. 2 万元, 26.8 元
D. 2 万元, 27 万元
【单选题】
下列关于合同类型的说法, 哪个是正确的?( }
A. 工料合同适用于工期长或较复杂的工作
B. 使用成本补偿类合同, 卖方的成本风险最大
C. 固定价格合同不管范围是否变化, 均不允许调整价格
D. 总价加激励费用合同中会规定最高限价
【单选题】
以下哪项不属于控制采购过程的数据分析技术? ( )
A. 绩效审查
B. 挣值分析
C. 趋势分析
D. 决策树分析
【单选题】
哪个措施对开展采购中的财务管理工作最有效? ( )
A. 开展检查后再付款
B. 在合同中约定按供应商实际产出的成果来付款
C. 在合同中约定按供应商已经完成的工时来付款
D. 在合同中规定财务处罚条款
【单选题】
项目要开展一次小规模采购。 由于时间紧迫, 相关方希望能简化采购所需步骤, 尽快选出供应商。 项目经理可以建议 ( )。
A. 尽快请相关方推荐一家供应商
B. 从组织预先批准的卖方清单中选择
C. 使用上一次合作过的供应商
D. 先找供应商开展工作再补招标手续
【单选题】
买方正在检查卖方的工作, 考察卖方履行合同的能力, 以便决定是否把卖方列入项目后期另一个合同的潜在卖方清单。 买方正在开展哪项工作? ( )
A. 检査
B. 索赔管理
C. 合同变更控制
D. 绩效审査
【单选题】
前任项目经理与承包商口头达成了一致, 同意将预付款比例由 30%调整为 40%。 当承包商拿着 40%的预付款申请来找你签字时, 作为新任项目经理你应该怎么做?( )
A. 拒绝签字, 按合同支付比例执行
B. 签字, 因为前任项目经理已经和承包商达成一致
C. 拒绝签字, 因为合同条款是不能变更的
D. 拒绝签字, 因为你不了解情况
【单选题】
对于采购价值比较小, 不值得花时间和成本进行过多比较的采购, 可以采用哪种方法 选择供应商? ( )
A. 最低成本
B. 仅凭资质
C. 固定预算
D. 独有来源
【单选题】
如果有多个供应商同时为项目工作, 买方应该 ( )
A. 防止供应商之间串通来损害买方利益
B. 要求供应商之间的- 切联系都要通过买方来进行
C. 要求供应商之间签署横向合作协议
D. 管理好供应商之间的沟通
【单选题】
你正在分析应该将相关培训工作外包还是直接由团队中的工程师来完成。 此时项目采购正处于以下哪个过程?( )
A. 规划采购管理
B. 实施采购
C. 控制采购
D. 结束项目或阶段
【单选题】
一份好的招标文件, 必须具备以下特点, 除了 ( )
A. 详细程度与采购的价值和风险相符
B. 非常详细, 能让卖方做出基本一致的应答
C. 足够灵活, 让卖方为满足相同的要求而提出更好的建议
D. 方便买方对卖方的应答进行评价
【单选题】
实施采购中的谈判, 应该以谁为主导? ( )
A. 项目经理
B. 组织法务部的人员
C. 组织采购部的人员
D. 拥有合同签署权的人员
【单选题】
对方说 “ 我已经订好了明天晚上 8 点的飞机,我们必须在明天下午 5 点前达成一致”。请问对方使用的是哪种谈判策略()?
A. 既成事实
B. 最后期限
C. 红脸白脸
D. 权力有限
【单选题】
对于索赔和争议的处理, 最好按如下哪种顺序进行? ( )
A. 谈判、 调解、 起诉
B. 谈判、 仲裁、 起诉
C. 仲裁、 谈判 、 调解
D. 起诉、 调解、 谈判
【单选题】
采购工作说明书一般包括以下内容, 除了 ( )。
A. 履约期限
B. 性能参数
C. 工作地点
D. 应答格式要求
【单选题】
买方和卖方已经完全履行了本次采购合同中的权利和义务, 需要关闭采购。 这项工作应该在以下哪个过程完成? ( )
A. 控制采购
B. 结束采购
C. 结束项目或阶段
D. 实施采购
【单选题】
关于项目相关方管理, 下列说法不正确的是 ( )。
A. 与相关方的沟通要持续进行
B. 相关方满意度是一个关键的项目目标
C. 为了节约时间和精力, 应该把相关方管理局限于最重要的相关方
D. 受项目影响或能对项目施加影响的人都是项目的相关方
【单选题】
应该在项目的哪个阶段识别项目相关方?( )
A. 启动阶段
B. 规划阶段
C. 执行阶段
D. 收尾阶段
【单选题】
以下哪个是管理相关方参与过程的工具与技术? ( )
A. 基本规则
B. 数据收集
C. 决策
D. 数据表现
【单选题】
制定调动相关方参与的特定策略或方法, 是以下哪个过程的活动之一? ( )
A. 识别相关方
B. 规划相关方参与
C. 管理相关方参与
D. 监督相关方参与
【单选题】
相关方和项目哪个阶段的关系最密切, 应该在相关方登记册中被记录为( )。
A. 身份信息
B. 评估信息
C. 相关方分类
D. 假设条件
【单选题】
在规划相关方参与时, 需要考虑以下哪项事业环境因素? ( )
A. 相关设施和资源的地理分布
B. 经验教训知识库
C. 组织对沟通的要求
D. 政府或行业标准
【单选题】
以下哪项是规划相关方参与过程的输入?( )
A. 沟通管理计划
B. 项目管理计划
C. 商业文件
D. 相关方参与计划
【单选题】
处理相关方的关注点, 防止这些关注点演变成对项目有负面影响的问题, 这是哪个过程的工作?()
A. 管理相关方参与
B. 识别相关方
C. 监督相关方参与
D. 规划相关方参与
【单选题】
项目相关方管理应该按如下哪种顺序开展? ( )
A. 规划相关方参与, 识别相关方, 管理相关方参与, 监督相关方参与
B. 规划相关方管理, 识别相关方, 管理相关方参与, 监督相关方参与
C. 识别相关方, 规划相关方参与, 管理相关方参与, 监督相关方参与
D. 识别相关方, 规划相关方管理, 管理相关方参与, 控制相关方参与
【单选题】
当各相关方的利益出现不可协调的冲突时, 应该以谁的利益为最重? ( )
A. 客户
B. 项目发起人
C. 项目经理
D. 高级管理层
【单选题】
相关方参与度评估矩阵中, 相关方所需参与水平是如何确定的?( )
A. 发起人要求的
B. 项目经理确定的
C. 项目团队评估出来的
D. 相关方自己设定的
【单选题】
项目进行过程中, 高级管理层要求各项目每个季度末都要开展一次相关方满意度调查,并将调查结果作为考核各项目经理的一项重要指标。 这样做的主要原因是 ( )。
A. 可以获得更多项目资金
B. 相关方满意度是一个关键的项目目标
C. 有利于和相关方搞好关系, 便于可交付成果通过相关方的验收
D. 可以方便变更审批
【单选题】
关于识别相关方, 下列说法错误的是 ( )。
A. 识别相关方越早越好
B. 识别相关方是项目经理的事
C. 识别相关方要全面
D. 识别相关方在整个项目生命周期内都要持续不断地进行
【单选题】
监督相关方参与过程的输出可能会导致以下哪个项目文件的更新? ( )
A. 相关方登记册
B. 相关方参与计划
C. 沟通管理计划
D. 变更日志
【单选题】
以下关于相关方的说法, 错误的是 ( )。
A. 相关方不包括那些实际上不会却自认为会受项目影响的人
B. 相关方既包括员工、 股东等个人, 也包括监管机构等群体
C. 相关方可以主动影响项目或被动受项目影响
D. 相关方可能给项目带来负面价值
【单选题】
管理相关方参与过程使用基本规则技术, 主要是为了 ( )。
A. 对项目团队成员的可接受行为做出明确规定
B. 明确应该采取什么行为引导相关方参与项目
C. 约束相关方的行为
D. 减少相关方之间的误解
【单选题】
影响与具体相关方互动的各种制约因素, 应该被记录在 ( )
A. 假设日志
B. 变更日志
C. 问题日志
D. 风险登记册
【单选题】
新办公大楼即将开工建设, 周边居民担心开工后的噪声和粉尘会影响他们的生活,对该项目有抵触情绪。 项目经理应该怎样做? ( )
A. 尽早听取他们的意见,适当调整施工方案
B. 只要他们不采取实际行动干扰项目进展, 就不用理会他们的抵触情绪
C. 要求办公大楼的客户与周边居民协调解决矛盾
D. 建议项目发起人取消这个项目
【单选题】
项目的主要相关方中, 发起人最重要的作用是 ( )
A. 为项目提供资金
B. 签署项目章程
C. 参与阶段末评审
D. 游说更高层管理人员
【单选题】
以下哪项是对相关方影响项目的合法资格、 对项目成果的关心程度和促使项目改变的能力的最好描述?( )
A. 利益、 权力、 影响
B. 权力、 利益、 作用
C. 权力、 影响、 作用
D. 作用、 权力、 影响
【单选题】
需求文件是以下哪个过程的输入?( )
A. 识别相关方
B. 规划相关方参与
C. 管理相关方参与
D. 监督相关方参与