【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AB
解析
暂无解析
相关试题
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
推荐试题
【单选题】
根据《个人贷款管理暂行办法》规定,贷款人应加强对贷款的发放管理,遵循_____分离的原则,设立_____放款管理部门或岗位,负责落实放款条件,发放满足约定条件的个人贷款。( )___
A. 前台与后台;独立的
B. 调查与审查;专门的
C. 审贷与放贷;专门的
D. 审贷与放贷;独立的
【单选题】
关于个人贷款还款方式变更,下列说法正确的是( )。___
A. 借款人可通过电话或书面方式提出还款方式变更申请
B. 各种还款方式之间可以随意相互变更
C. 借款人贷款账户中应没有拖欠本息及其他费用
D. 借款人可在变更还款方式后归还当期贷款本息
【单选题】
借款人委托其他自然人代办个人贷款的划付时,代理人需要持有的证件或材料不包括( )。___
A. 本人身份证件
B. 借款人身份证件
C. 借款人授权委托书
D. 个人住房贷款审批表
【单选题】
个人耐用消费品贷款的贷款期限一般为( )。___
A. 半年以内,最长不超过 2 年
B. 一年以内,最长不超过 2 年
C. 一年以内,最长不超过 3 年
D. 两年以内,最长不超过 3 年
【单选题】
银行在受理借款人个人抵押授信贷款业务时,不能接受的抵押物是( )。___
A. 借款人全额购买的期房
B. 借款人自有住房
C. 借款人自有商用房
D. 借款人抵押在银行的住房
【单选题】
借款合同签订以后,如果( ),则允许变更借款合同。___
A. 借款人不履行借款合同,贷款难以收回
B. 借款人已经申请破产,进入清算程序
C. 借款人因不可抗拒的意外事故致使合同无法履行
D. 经借贷双方协商同意
【单选题】
关于借款合同的变更与解除.下列说法错误的是( )。___
A. 借款合同依法需要变更的,必须经借贷双方协商同意,协商未达成之前借款合同继续有效
B. 如需办理抵押变更登记的,借款人应到原抵押登记部门办理变更抵押登记手续及其他相关手续
C. 当借款保证人失去保证能力时,借款人可申请以信用贷款替代原贷款
D. 借款人在还款期限内丧失民事行为能力后,如果没有财产继承人和受遗赠人,贷款银行有权提前收回贷款,并依法处分抵押物或质物,用以归还未清偿部分
【单选题】
( )不是商用房贷款借款人应具备的基本条件。___
A. 以借款人拟购商用房向贷款人提供抵押担保
B. 在银行开立个人结算账户
C. 具有稳定的职业和收入.具备还款意愿和还款能力
D. 发放对象是持有工商行政管理机关核发的非法人营业执照的个体
【单选题】
关于商用房贷款的还款方式,表述错误的是( )。___
A. 一笔贷款只能选择一种还款方式
B. 借款人可根据需要选择还款方式
C. 借款人如想提前偿还全部或部分贷款本息,应提前 15 个工作日向贷款银行提出申请
D. 合同签订后.还款方式未经贷款银行同意不得更改
【单选题】
贷款人受理借款人商用房贷款申请后,应对商用房贷款申请内容和相关情况的( )进行调查核实。___
A. 真实性、准确性、可靠性
B. 风险性、可靠性、真实性
C. 真实性、准确性、完整性
D. 风险性、收益性、流动性
【单选题】
关于个人经营贷款的说法,不正确的是( )。___
A. 发放对象为从事合法生产经营的法人企业或个体工商户
B. 借款人是具有完全民事行为能力的自然人
C. 相对个人住房贷款,个人经营类贷款风险更容易控制
D. 借款人可将该贷款用于定向购买商用房
【单选题】
个人经营贷款的特点不包括( )。___
A. 贷款期限相对较短
B. 风险控制难度较大
C. 适用面窄
D. 贷款用途多样.影响因素复杂
【单选题】
不属于贷款人通过面谈应该了解的情况的是( )。___
A. 申请人的基本情况
B. 抵押物的对立面、内部结构和周边环境情况
C. 贷款用途
D. 还款意愿和还款能力
【单选题】
赵先生在信用社连续 3 次进入黑名单,现在想在信用社用信,以下对的是___
A. 客户经理直接进行黑名单删除
B. 汇报经联社删除
C. 不影响办理贷款
D. 无法删除且无法办理贷款
【单选题】
下列对个人经营贷款操作风险的理解中,错误的是( )。___
A. 贷款流程执行不严格
B. 操作风险是贷款发放之前的风险
C. 审批人员放松审批条件向关系人发放贷款
D. 未严格执行商业银行授权管理制度,超权限审批发放贷款
【单选题】
下列关于农户贷款的表述,错误的是( )。___
A. 农户贷款仅可用于生产经营用途
B. 依据贷款审查结果,确定授信额度,作出审批决定,在办结时限以前,将贷款审批结果及时、主动告知借款人
C. 贷中审查应当对贷款调查内容的合规性和完备性进行全面审查
D. 农村金融机构应当遵循审慎性与效率原则,建立完善独立审批制度
【单选题】
下列不可以作为个人经营贷款申请材料中个人收入证明的是( )。___
A. 个人纳税证明
B. 在银行近 3 个月内的存款
C. 工资薪金证明
D. 个人在经营实体的分红证明
【单选题】
在个人经营贷款中,借款人变更还款方式需要满足的条件不包括( )。___
A. 借款人应向银行提交还款方式变更申请书
B. 借款人的贷款账户未拖欠本息及其他费用
C. 借款人具备还款意愿和还款能力
D. 借款人在变更还款方式前应归还当期的贷款本息
【单选题】
个人信用贷款的特点不包括( )。___
A. 贷款额度小
B. 准入条件严格
C. 贷款风险较低
D. 贷款期限短
【单选题】
个人贷款可采用多种担保形式,其中不正确的是( )___
A. 保证担保
B. 信用担保
C. 抵押担保
D. 质押担保
【单选题】
不良个人住房贷款的处置方式不包括( )。___
A. 通过拍卖行竞拍
B. 申请强制执行
C. 向法院提起诉讼
D. 与借款人协商变卖
【单选题】
借款人变更还款方式,需要满足的条件不包括( )。___
A. 借款人收入水平、工作单位未发生变化
B. 向银行提交还款方式变更申请书
C. 借款人的贷款账户中没有拖欠本息及其他费用
D. 借款人在变更还款方式前应归还当期的贷款本息
【单选题】
对个人经营贷款借款人的生产经营收入,应重点调查的内容不包括( )。___
A. 经营收入的合法性
B. 经营收入的稳定性
C. 未来收入预期的合理性
D. 经营成本的稳定性
【单选题】
在个人信用报告中,个人贷款 24 个月还款状态记录中,________ 表示担保人代还,即借款人的该笔贷款已由担保人代还,包括担保人按期代还与担保人代还部分贷款。( )___
A. *
B. N
C.
D.
【单选题】
个人贷款调查应以()方式为主。___
A. 电话查询
B. 间接查询
C. 信息查询
D. 实地查询
【单选题】
下列不属于按照担保方式划分的个人贷款产品的是()。___
A. 个人抵押贷款
B. 个人质押贷款
C. 个人信用贷款
D. 个人流动资金贷款
【单选题】
下列关于个人贷款合同的说法,错误的是()。___
A. 应使用统一格式的个人贷款的有关合同文本
B. 对不准备填写内容的空白栏不需再做处理
C. 同笔贷款的合同填写人与合同复核人不得为同一人
D. 对采取抵押担保方式的,应要求抵押物共有人在相关合同文本上签字
【单选题】
在个人贷款业务中,下列主体可能具有担保资格的是( )。___
A. 与借款人有关系的自然人
B. 不具有代偿能力的法人
C. 有重大违法行为损害银行利益的法人
D. 三年内连续亏损的法人
【单选题】
关于个人贷款还款方式变更,下列说法正确的是( )。___
A. 借款人可通过电话或书面方式提出还款方式变更申请
B. 各种还款方式之间可以随意相互变更
C. 借款人贷款账户中应没有拖欠本息及其他费用
D. 借款人可在变更还款方式后归还当期贷款本息
【单选题】
依照我国现行法,下列自然人中为限制民事行为能力或无民事行为能力人的是()。___
A. 张某,双耳失聪
B. 王某.精神失常
C. 李某,高位截瘫
D. 赵某.双目失明
【单选题】
个人基础数据库信用信息查询主体不包括( )。___
A. 个人
B. 企业
C. 商业银行
D. 政府机构
【单选题】
中国人民银行征信管理部门应当在收到个人异议申请的( )个工作日内将异议申请转交征信服务中心,征信服务中心应当在接到异议申请的( )个工作日内进行内部核查。___
A. 2;2
B. 2;5
C. 5;5
D. 5;10
【单选题】
征信报告中逾期记录保存的年限是( )___
A. 2 年
B. 3 年
C. 5 年
D. 10 年
【单选题】
个人住房贷款,在等额本金还款法下,借款人每月等额偿还本金,贷款利息则随本金余额逐月递减,因此还款总额()。___
A. 逐月递增
B. 不变
C. 逐月递减
D. 不定
【单选题】
个人综合消费贷款的期限最长不超过()。___
A. 1 年(含)
B. 2 年(含)
C. 3 年(含)
D. 5 年(含)
【单选题】
个人贷款资金应当采用受托支付方式向借款人交易对象支付,但借款人无法事先确定具体交易对象且金额不超过____元人民币的,可以采取自主支付方式。___
A. 20 万
B. 30 万
C. 50 万
D. 100 万
【单选题】
“金燕快贷通”按照“随用随贷余额控制周转使用阳光操作”的办法进行动态管理。()___
A. 一次核定
B. 双人核定
C. 一次申请
D. 金额不限
【单选题】
个人客户申请贷款应具备以下哪种基本条件()。___
A. 具有完全民事行为能力的中华人民共和国公民或符合国家有关规定的境外自然人。
B. 用途明确合法。
C. 申请数额、期限合理。
D. 以上都是
【单选题】
对个人信贷业务审核的主要内容包括哪几项()。___
A. 客户主体资格、贷款条件、贷款用途、贷款金额、贷款期限等是否符合相关业务管理办法的规定。
B. 申报资料是否完整、合规,申请书、审批表所填内容要素是否完整。
C. 客户经理出具的调查报告是否客观、详实
D. 以上都是
【单选题】
个人客户申请借款时应具备的基本条件包括:()、用途明确合法、申请数额期限合理、具备还款意愿和还款能力、信用状况良好、在农信社开立金燕卡或个人结算账户。___
A. 具有完全民事行为能力的中华人民共和国公民或符合国家有关规定的境外自然人。
B. 具有完全民事行为能力的中华人民共和国人民
C. 中华人民共和国公民
D. 任何人