【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
AB
解析
暂无解析
相关试题
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
推荐试题
【单选题】
BXD61、团队成员都在执行他们熟悉的任务,而避开他们不喜欢的任务,这造成团队成员之间的冲突。项目经理应该怎么做?___
A. 分配明确的角色和职责
B. 与团队成员的直线经理谈话
C. 与团队成员协商
D. 获得项目发起人的澄清
【单选题】
BXD62、一个项目的项目经理被替换,新的项目经理识别到项目超出预算并落后于进度计划。新项目经理首先应该做什么?___
A. 要求项目发起人增加预算并延长进度计划
B. 获得项目发起人的批准,重新组织团队
C. 减少项目范围以满足原始预算和进度计划
D. 识别改进领域和加强监督
【单选题】
BXD63、为解决具有挑战性的客户请求,启动了一个项目。该项目必须在短时间内交付。项目经理应该怎么做来尽可能提高项目的成功率?___
A. 安排采购会议,加快采购
B. 将问题上报给项目发起人
C. 开始执行项目活动
D. 与团队一起制定详细计划
【单选题】
BXD64、一名积极参与产品规划的主管,要求全部的项目可交付成果提高产品产量。该主管的权力/利益水平分类是哪一项?___
A. 监督
B. 令其满意
C. 重点管理
D. 随时告知
【单选题】
BXD65、为了确定项目成本,项目经理利用一个过往类似项目的实际成本(AC)。项目经理使用的是哪一种估算技术?___
A. 参数估算
B. 类比估算
C. 自下而上估算
D. 三点估算法
【单选题】
BXD66、—个处于执行阶段的项目经历资源流动,项目经理和职能经理对专用项目资源的意见不一致。项目经理应该怎么做?___
A. 让关键资源集中办公
B. 使用专家判断
C. 应用协商和冲突管理技能
D. 审查工作绩效报告
【单选题】
BXD67、由于组织管理层的变化,一名新的项目相关方被分配到项目上。新的项目相关方请求高层级需求以及职权级别相关的信息。若要帮助该项目相关方,项目经理应查阅哪份文件?___
A. 范围管理计划
B. 项目章程
C. 项目范围说明书
D. 项目管理计划
【单选题】
BXD68、—个过去一直可靠的供应商正在为项目提供电源。然而,最新的单元未通过质量测试。应在哪份文件中记录这项失败及其减轻措施?___
A. 风险登记册
B. 问题日志
C. 采购管理计划
D. 验收标准
【单选题】
BXD69、在一个价值200万美元项目的测试阶段,团队发现了一些缺陷。由于截止期限很紧,团队成员承认他们可能无法修复所有缺陷。若要确定应集中哪些工作,项目经理应使用什么工具或技术?___
A. 帕累托图
B. 矩阵图
C. 散点图
D. 专家判断
【单选题】
BXD70、项目经理资源有限,无法获得更多资源。项目经理应该使用什么技术来充分利用现有资源,而不会使项目完成时间延期?___
A. 资源平滑
B. 资源平衡
C. 快速跟进
D. 赶工
【单选题】
BXD71、—个项目已经分包给破产的供应商,项目经理遵循批准的行动,但是一名项目相关方质疑该行动是否恰当。项目经理应该向该项目相关方分享什么文件?___
A. 风险登记册
B. 风险紧迫性评估
C. 影响分析
D. 定性分析
【单选题】
BXD72、在项目执行阶段,一场自然灾害损毁了关键供应商的工厂,虽然损毁程度尚未确定,但项目团队收集有关项目风险和后果信息。若要解决最相关的风险,首先应该做什么?___
A. 定性风险分析
B. 定量风险分析
C. 风险数据质量评估
D. 风险临界值计算
【单选题】
BXD73、尝试解决关键路径上的问题后,项目经理确定需要无偏见、不受外观影响的主题专家(SME),项目经理应使用什么信息收集技术来找到解决方案?___
A. 头脑风暴
B. 德尔菲技术
C. 访谈
D. 根本原因分析
【单选题】
BXD74、一个建造一家新医院的项目正在进行中。一名项目相关方要求项目提供所有相关项目文件。项目经理有一份文档,其中包含各种文件以及组成项目管理计划的各项从属计划。项目经理应该向该相关方提供哪些文件?___
A. 配置管理计划、工作分解结构(WBS)、成本基准、进度基准
B. 活动成本估算、变更请求、风险登记册、质量测量指标
C. 范围基准、相关方登记册、项目日历、里程碑清单
D. 项目章程、问题日志、风险管理计划、采购工作说明书(SOW)
【单选题】
BXD75、—家公司开始一个IT项目,部署一个新系统。在执行阶段,项目经理意识到项目超出了进度,并且没有额外的预算。项目经理应使用下列哪一项技术来解决进度差距?___
A. 资源平衡
B. 假设情景分析
C. 赶工
D. 快速跟进
【单选题】
BXD76、在项目实施期间,项目发起人要求项目经理审查和减轻新报告的风险。审查期间,项目经理确定只有一个是风险,而其他的都是问题。下列哪一项会被认为是风险?___
A. 新的市场法规很快将获得批准,这可能需要修订项目范围
B. 在项目初始阶段识别到设计缺陷
C. 一名主题专家(SME)离开项目,加入竞争对手的公司
D. 应急储备已被批准的变更请求耗尽
【单选题】
BXD77、项目团队包括一名资源,但该资源同时致力于其他四个项目,项目经理得知该资源可能在计划的时间不可用。项目经理计划持续评估项目的进展,并根据该资源的可用性计划制定应急计划。这属于下列哪一项的实例?___
A. 接受风险
B. 回避风险
C. 转移风险
D. 控制风险
【单选题】
BXD78、为了保持进度计划,项目经理需要在接下来的两周内获得项目相关方对项目管理计划的批准,但是,多名项目相关方将在本月底之前出国。项目资金仅可供未来三个月使用。项目经理应该怎么做?___
A. 认为项目将获得批准并开始项目工作
B. 安排评审会议和电话会议获得项目相关方的批准
C. 要求项目发起人代表项目相关方批准
D. 使用在其他项目上工作的空闲资源开始此项目的某些任务
【单选题】
BXD79、项目经理正在尝试建立一个产品从原产地到可交付成果记录信息之间的联系。下列哪一项将帮助项目经理完成这项工作?___
A. 系统交互图
B. 范围管理计划
C. 需求文件
D. 需求跟踪矩阵
【单选题】
BXD80、项目发起人和客户通知项目经理他们对产品结果满意。项目经理下一步应该怎么做?___
A. 解散项目团队并收集经验教训
B. 向项目相关方提供最终审查报告,并获得他们的反馈
C. 结束采购并向承包商付款
D. 获得项目相关方的正式验收,并结束项目
【单选题】
BXD81、在项目执行期间,团队成员提出纠正措施,帮助满足项目需求。项目经理应该怎么做?___
A. 将其包含在经验教训数据库中
B. 遵循变更管理计划
C. 将其正确地记录在问题日志中
D. 更新项目管理计划
【单选题】
BXD82、哪一份计划将帮助项目经理减轻分布在不同地理位置的团队经历隔离和误解的问题?___
A. 过程改进计划
B. 人员配备管理计划
C. 沟通管理计划
D. 相关方管理计划
【单选题】
BXD83、作为指导和管理一个项目的组成部分,项目经理必须审查已经完成的活动。项目经理应该首先审查哪份文件?___
A. 工作绩效数据
B. 之前的状态报告
C. 项目进度计划
D. 问题日志
【单选题】
BXD84、在一个大型、复杂项目途中,项目经理得知一名关键项目相关方退休了。上级管理层指定了一名替代人员,需要包含在后续项目活动中。项目经理应首先更新哪一份文件?___
A. 项目组织图
B. 相关方登记册
C. 沟通管理计划
D. 相关方状态报告
【单选题】
BXD85、在项目途中,会计经理通知项目经理项目剩余部分的资金不足。这让项目经理感到十分惊讶,因为项目经理一直在监测成本,并认为项目符合预算。项目经理应该怎么做?___
A. 请求增加预算,并提交新的成本基准用于批准
B. 使用项目储备涵盖成本超支
C. 核对发生的成本,并开展偏差分析
D. 快速跟进项目,解决成本超支问题
【单选题】
BXD86、—名监控流程的项目团队成员正在查看控制图,有六个连续的点低于平均值,但都在控制限制范围内。项目经理应该采取下列哪些行动?___
A. 调整流程
B. 创建石川图
C. 执行实验设计
D. 不需要采取任何行动
【单选题】
BXD87、项目经理注意到两名团队成员的矛盾正导致项目团队精神动力分散。项目经理应该怎么解决矛盾并恢复项目团队注意力?___
A. 给这两人签发口头警告
B. 重新分配资源,避免将来冲突
C. 与团队开会,确定关键问题所在,并允许公开讨论解决
D. 上报发起人
【单选题】
BXD88、项目经理负责安装和调试一个新的生产设施。一条新的生产线已准备好调试,且正在进行试生产。若要确保生产线的运行符合技术规范,项目经理应使用什么工具或技术?___
A. 标杆对照
B. 控制图
C. 检查
D. 流程图
【单选题】
BXD89、前两个一直处于正常进度轨道的项目开始经历严重延期。项目经理已经识别到重大问题。项目经理应在哪里报告项目状态?___
A. 项目进度计划
B. 工作绩效报告
C. 问题日志
D. 相关方会议
【单选题】
BXD90、一个期限很短的项目关键相关方希望避免质量控制。项目经理知道必须提供最低质量水平。项目经理使用的是什么工具或技术?___
A. 标杆对照
B. 统计抽样
C. 实验设计
D. 成本效益分析
【单选题】
BXD91、项目规划阶段结束时,细节信息不足以完成规划。项目经理接下来应该怎么做?___
A. 获得开始项目的批准,并在执行的同时,完善后续阶段的规划
B. 持续执行,直至所有必要细节均在规划中最终确定为止
C. 持续执行,并向专家咨询,获得继续执行的必要细节
D. 获得开始项目的批准,但是通知发起人,如果项目不能满足截止期限,项目经理概不负责
【单选题】
BXD92、客户识别到一个新实施产品的性能问题。项目经理应使用哪一个质量成本(COQ)类别来估算这项成本?___
A. 预防成本
B. 外部失败成本
C. 评估成本
D. 内部失败成本
【单选题】
BXD93、根据风险管理计划,项目经理对一些项目风险执行减轻策略。然而,其中一项风险的发生概率和影响都提高了,且主要可交付成果可能会受到损害。项目经理应该如何解决并沟通这种情况对项目的影响?___
A. 在项目状态报告中包含这种情况
B. 定义减轻或消除该风险的对策,并与相关方沟通这种情况
C. 更新项目基准,以反映该风险的影响
D. 更新风险管理计划并签发变更请求,从项目中删除这些可交付成果
【单选题】
BXD94、名团队成员不清楚项目经理的主要职责和职权级别,哪一份文件可以帮助团队成员了解这一点?___
A. 项目章程
B. 项目管理计划
C. 组织结构
D. 项目资源管理计划
【单选题】
BXD95、在准备工作分解结构(WBS)时,项目经理识别到可能存在成本超支。项目经理应使用什么工具或技术来获得三点估算?___
A. 项目相关方访谈
B. 敏感性分析
C. 风险分析
D. 定量分析
【单选题】
BXD96、一个构建月度报告的项目涉及两个团队。团队X从事后端数据库的工作,团队Y从事构建报告的用户界面前端工作。项目经理要求两个团队的代表在需求收集过程中担任主题专家(SMEs),其中一位主题专家是该领域广受尊敬的人物,项目经理担心可能出现偏差。项目经理应使用什么工具或技术?___
A. 德尔菲技术
B. 多标准决策分析
C. 石川图
D. 头脑风暴
【单选题】
BXD97、项目经理在两个期限紧迫的项目之间轮替。尽管时间有限,但他决定从这两个项目中收集经验教训。项目经理应如何收集经验教训?___
A. 在每个项目完成时记录经验教训
B. 请求知识管理部门的帮助
C. 存档项目会议的所有会议记录
D. 从启动阶段开始,定期记录经验教训
【单选题】
BXD98、—个高速公路建设项目按时、按预算执行。项目经理刚刚得知现场发现了一个不可预见的矿藏,这将要求高速公路改道,而改道将需要转移附近居民。项目经理将需要哪一项工具或技能来处理这个问题?___
A. 与当地政府机构的良好个人关系
B. 冲突管理和谈判
C. 范围蔓延管理
D. 解行业实践
【单选题】
BXD99、项目需要一位熟练的工程师来执行某个特定任务,但由于工作量大,该工程师不能参与这个项目。项目经理下一步应该怎么做?___
A. 修改进度计划,以适应该资源
B. 与职能经理协商该资源的参与
C. 培训项目团队中的某个成员来执行所需的活动
D. 要求发起人提供更多的时间来寻找其他资源来执行任务
【单选题】
BXD100、项目经理发现公司的质量保证(QA)部门可能没有足够的人员根据合同约定的进度计划测试项目产品。项目经理首先应该怎么做?___
A. 审查问题日志
B. 更新风险登记册
C. 取消一些非关键测试
D. 压缩进度计划