【单选题】
An administrator has recently upgraded from vSphere 6.0 to 6.5, and can no longer see the software iSCSI named vmhba33. Which could be the reason for this?___
A. The upgrade has changed the vmhba name.
B. vSphere 6.5 automates iSCSI configurations.
C. vSphere 6.5 no longer supports software iSCSI.
D. The upgrade has deleted the vmhba.
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
A
解析
暂无解析
相关试题
【单选题】
An administrator is trying to vMotion a VM from his datacenter to a recovery site. Which is the maximum allowed RTT (Round-Trip Time) latency between source and destination host?___
A. 100 milliseconds
B. 150 milliseconds
C. 15 milliseconds
D. 10 milliseconds
【单选题】
Which is required for configuring iSCSI Software Adapter network port binding?___
A. VMkernel of the iSCSI traffic must be load balanced using Route based on IP Hash algorithm.
B. VMkernel of the iSCSI traffic must be load balanced using Route based on Source Virtual Port ID algorithm.
C. VMkernel of the iSCSI traffic must be load balanced using Route based on Source MAC Hash algorithm.
D. VMkernel of the iSCSI traffic must be bound to only one active network adapter.
【单选题】
In vSphere Data Protection 6.1, which is the function of a Backup Verification job?___
A. None. Backup Verification job is not a feature of vSphere Data Protection
B. It is a manual task -Power it on -Verify the guest OS -Check started applications
C. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OS is booted by communicating with the Backup Verification agent
D. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OC is booted by detecting the VMware ToolsTM "heartbeats"
【单选题】
An administrator has enabled vSphere Distributed Switch Health Check. The hosts connected to that Distributed Switch all display an alert:< vSphere Distributed Switch MTU supported status > .The administrator has all of the VMkernel ports MTU sizes set to 1600. Which action will remedy this problem?___
A. Configure the Distributed Switch to MTU 9100.
B. Disconnect and reconnect the physical network cable.
C. Configure the physical switch to MTU 1600.
D. Disable the Distributed Switch MTU.
【单选题】
Which Host Profile Subprofile configuration is used to configure firewall settings for ESXi hosts?___
A. Advanced Configuration Settings
B. General System Settings
C. Security
D. Networking
【单选题】
Where would a vSphere administrator find general vCenter Server logs on a vCenter Server Appliance?___
A. /var/log/vmware/vpxd/
B. /var/log/messages
C. /etc/vmware-vpx/
D. /var/log/vmware/vsan-health/
【单选题】
An administrator wishes to enable network port mirroring based on source port. Which feature should be enabled?___
A. vSphere standard switch port
B. ERSPAN
C. NSX Virtual Wire
D. VLAN
【单选题】
Which CLI command shows the physical uplink status for a vmnic?___
A. esxcli network ip connection list
B. esxcli network ip neighbor list
C. esxcli network nic get
D. esxcli network nic list
【单选题】
Which is the maximum number of block devices (LUNs) that are supported by ESXi hosts that are running version 6.5?___
A. 1024
B. 512
C. 2048
D. 256
【单选题】
When performing a vCenter Server 5.5 for Windows with Microsoft SQL Server Express database migration to vCenter Server Appliance 6.5, which will be the target database?___
A. Microsoft SQL Server Express 2012R2
B. Microsoft SQL Server Standard 2012R2
C. PostgreSQL
D. Oracle DB 11g
【单选题】
An administrator has multiple vCenter Server 6.5 systems but cannot enable Storage I/O Control (SIOC) on a datastore shared by ESXi hosts managed by the vCenter Server systems. Which action should the administrator take to resolve the issue?___
A. Unmount the datastore and then enable SIOC on the vCenter Server system.
B. Configure the datastore to be managed by a single vCenter Server system.
C. Configure Storage DRS and then enable SIOC on the vCenter Server system.
D. Enable Raw Device Mapping (RDM) on the
E. SXi hosts.
【单选题】
“OneAppServer” is a VM template stored in a content library named “LibraryOne”, but the vSphere administrator is not able to use this template for deployment. Why is the administrator unable to deploy OneAppServer?___
A. OneAppServer must be updated before it can be deployed.
B. LibraryOne is a subscribed library and OneAppServer is not downloaded yet.
C. LibraryOne is published and optimized for syncing over HTTP.
D. OneAppServer was imported from a local file on the system.
【单选题】
An administrator sets the Failover Capacity for both CPU and Memory at 25%. Based on the Exhibit below, how much of the cluster’s total CPU resources are still available to power on additional virtual machines?___
A. 45%
B. 25%
C. 70%
D. 60%
【单选题】
Which statement applies to the vSphere Replication appliance?___
A. Only one vSphere Replication appliance can be deployed per vCenter Server instance.
B. VMware Tools in the vSphere Replication appliance can be upgraded.
C. A single vSphere Replication appliance can manage a maximum of 4000 replications.
D. vSphere Replication is available only with the vSphere
E. ssentials Plus license.
【单选题】
Which esxcli namespace can a vSphere Administrator use to adjust the queue depth?___
A. esxcli system module parameters
B. esxcli storage core device
C. esxcli system module set
D. esxcli storage core adapter
【单选题】
Which statement regarding datastore clusters meets VMware’s recommended best practices?___
A. Clusters should contain only datastores presented from the same storage array.
B. Clusters should contain only datastores with equal hardware acceleration capability.
C. Clusters should contain only datastores with the same capacity.
D. Clusters should contain only datastores using the same connection method (iSCSI, FC, etc.).
【单选题】
What VM Monitoring setting would ensure that the maximum reset window for a virtual machine is 24 hours?___
A. Medium
B. Low
C. High
D. Normal
【单选题】
What is the default space threshold for vSphere Storage DRS?___
A. 80%
B. 70%
C. 90%
D. 95%
【单选题】
Which is the correct sequence to upgrade a vSphere infrastructure?___
A. vCenter Server>ESXi host> VMware Tools>VM compatibility
B. ESXi host>vCenter Server> VMware Tools>VM compatibility
C. vCenter host> ESXi host> VM compatibility> VMware Tools
D. ESXi host>vCenter Server> VM compatibility>VMware Tools
【单选题】
An administrator has a large boot from SAN cluster and wants to ensure consistent configuration by using host profiles. What special considerations are required for boot from SAN hosts?___
A. Change the “Device is shared clusterwide” setting to “false” in the host profile.
B. Verify that the boot LUN is correctly identified as the boot device in the host profile.
C. The boot from SAN device must report as a local device.
D. Host profiles are incompatible with boot from SAN hosts.
【单选题】
When using VMware Converter to import a Windows server and improve the consistency of the destination virtual machine, which optional step can be performed immediately prior to powering down the source server?___
A. Perform a final synchronization task.
B. Remove the server from the network.
C. Uninstall production applications.
D. Remove the server from the Active Directory domain.
【单选题】
Restoration of the vCenter Server Appliance is accomplished using which interface?___
A. vSphere Web Client
B. vSphere Client
C. vCenter Server Appliance Management Interface
D. vCenter Server Appliance GUI Installer
【单选题】
When attempting to migrate a virtual machine to another host in the same cluster, the error message, “Select a valid compute resource” returns. What could cause this error?___
A. Both hosts run different versions of ESXi.
B. Both hosts are not sharing the same datastore.
C. VMware Tools is not installed.
D. Virtual machine has an ISO attached.
【单选题】
When will vSphere Data Protection delete the expired backup image of a Platform Service Controller?___
A. Immediately after the retention period has expired.
B. After the expired backup image is restored.
C. During the next backup window following expiry.
D. During the next maintenance window following expiry.
【单选题】
Group A has permission to download files in Content Library. Group B does not have permission to download files in Content Library. If a user is a member of both groups, what will be the result?___
A. The user cannot download file from Content Library.
B. The user can download file from Content Library.
C. The user cannot access Content Library.
D. The user can access Content Library.
【单选题】
An administrator is trying to set up Host Partial Failure Response, but the Automated option is grayed out. What can the administrator change to enable the Automated option?___
A. Change the vSphere DRS Automation level to Partially Automated.
B. Change the vSphere DRS Automation level to Fully Automated.
C. Enable vSphere HA Host Monitoring.
D. Change the vSphere DPM Automation level to Automatic.
【单选题】
When you attempt to open a virtual machine console from the vSphere Web Client, the console does not connect. The following error message appears:<HTTP ERROR 404> <Problem accessin/.Reason: Not Found>. Why did not connect?___
A. Port 443 is in use.
B. Port 9443 is in use.
C. Port 8443 is in use.
D. Port 22443 is in use.
【单选题】
What new feature was introduced to the Content Library in vSphere 6.5?___
A. Mount an ISO directly from the Content Library.
B. Deploy a virtual machine from an OVF Package in a Content Library.
C. Upload a File from a URL to a Library Item.
D. Upload a File from a Local System to a Library Item.
【单选题】
How can an administrator exclude Encryption rights from a support engineer?___
A. Clone the role Virtual machine power user, remove Cryptographic operations privileges.
B. Clone the role Administrator and assign to the support engineer.
C. Clone the role Virtual machine power user and assign to the support engineer.
D. Clone the role No cryptography administrator and select privileges only for the support engineer.
【单选题】
The administrator must back up a vCenter HA deployment. Which component must be backed up?___
A. Passive node
B. Witness node
C. External database
D. Active node
【单选题】
What is the supported protocol to perform remote L3 traffic monitoring in vSphere 6.5?___
A. VXLAN
B. ERSPAN
C. RSPAN
D. SPAN
【单选题】
What are the minimum hardware requirements for a Windows vCenter Server with embedded PSC that manages a “Small” environment?___
A. 2vCPUs, 16 GB RAM
B. 4 vCPUs, 16 GB RAM
C. 2 vCPUs, 10 GB RAM
D. 4 vCPUs, 10 GB RAM
【单选题】
Which port is used for communication between ESXi and vSphere Data protection?___
A. 80
B. 443
C. 902
D. 22
【单选题】
What can prevent Storage DRS from functioning on a datastore?___
A. The datastore is configured for Virtual Machine Swapfile location.
B. The datastore is shared across multiple datacenters.
C. The datastore is connected to a host that is running Storage I/O Control.
D. Storage DRS advanced option IgnoreAffinityRulesForMaintenance is set to 1.
【单选题】
When troubleshooting VMware vCenter Server issues, when logging level provides maximum detail?___
A. Verbose
B. Trivia
C. Info
D. Error
【单选题】
What new feature is introduced in NFS 4.1 on ESXi 6.5?___
A. IPv6
B. KRB5i
C. AUTH_SYS
D. Storage DRS
【单选题】
What configuration option would ensure that a virtual NUMA topology is defined on VMs having more than eight virtual CPUs?___
A. cupid.coresPerSocket
B. numa.vcpu.followcorespersocket
C. numa.vcpu.maxPerVirtualNode
D. numa.vcpu.min
【单选题】
What is the minimum disk space required to deploy vSphere Data Protection (VDP) with 8 TB configuration?___
A. 4 TB
B. 16 TB
C. 8 TB
D. 12 TB
【单选题】
What advanced option for vSphere HA defines a maximum number of reset attempts by VMCP for a virtual machine?___
A. das.maxterminates
B. das.isolationshutdowntimeout
C. das.maxresets
D. fdm.isolationpolicydelaysec
【单选题】
What vSphere technology enables the administrator to ensure consistent configuration at scale?___
A. PowerCLI
B. Host Profiles
C. esxcli
D. vSphere Web Client
推荐试题
【单选题】
AMA84项目管理团队等到可交付成果或子项目澄清后才能制定详细的工作分解结构,这种情况下,该选择下面哪项技术?___
A. 叠加式规划
B. 自上而下规划
C. 滚动式规划
D. 自下而上规划
【单选题】
AMA86如果项目因某些活动时间限制而无法如期完工,客户对这些活动可作出何种推测?___
A. 开始时间不切实际
B. 资源不足
C. 最晚的开始时间,晚于最早的结束时间
D. 他们存在浮动时间
【单选题】
AMA87从前一个项目中学到的经验教训对当前的项目范围说明书会产生什么影响?___
A. 由于工作分解结构是完整的,经验教训对范围说明书不会产生影响.
B. 如果不忽视经验教训,范围说明书的制定会更快
C. 在当前的范围说明书中,将不大可能会重复过去的错误或疏忽失误.
D. 经验教训不会收到经验教训知识库的影响,因为所有项目都是独特的.
【单选题】
AMA88某天晚上下班的时候,由于司机休假,你们公司的CEO不得不自己开车。但是他怎么也找不到出楼的路,加上他本来已经比较疲惫了,所以他感到非常恼火。第二天就找人要改善本楼的出入系统,以方便大家进出。而你正是这个出入系统的项目经理,你决定用流程图来做什么事情?___
A. 帮助分析问题是如何出现的
B. 表明任务之间的依赖关系
C. 说明一个流程的结果
D. 预测未来成果
【单选题】
AMA89项目经理完成三个月的工作,成本偏差为$-3,000美元,挣值分析显示下列哪一项?___
A. 有利;项目的执行效率比计划高
B. 不利;项目的执行效率比计划低
C. 有利;项目提前于进度
D. 不利;项目落后于进度
【单选题】
AMA90应急储备应:___
A. 隐蔽,以防止管理层不批准该项资金
B. 加到每项任务上,以防止客户知道该储备金的存在
C. 由管理层掌握,用来填补成本超支
D. 加到项目的基本成本上,用来解决风险问题
【单选题】
AMA91在质量控制期间,项目经理发现超出产品A的控制限值结果比质量测量指标中规定的频率高.项目经理决定启动质量审计.谁应该执行质量审计?___
A. 公司或外部审计员
B. 负责产品A的团队成员
C. 其他团队成员
D. 项目经理
【单选题】
AMA92项目的进度绩效指数为0.5,成本绩效指数为0.25,当第一个里程碑接近完成时,项目经理会引导第一次相关方会议沟通项目状态。在项目的这个时候,项目经理应该做什么?___
A. 向项目相关方提供有关项目状态的正面反馈
B. 召开一次团队会议,讨论将项目恢复正常进度并符合预算的方法
C. 向相关方沟通项目符合进度,但超出预算
D. 提交一项变更请求,增加工期和预算
【单选题】
AMA93你刚刚收到客户对项目的正式确认,你下一步应该做的是___
A. 把接受到的确认文件分发给其他的项目相关方
B. 把接受到的确认文件归入项目档案
C. 同员工一起整理在这个项目中获取的经验和教训
D. 进行项目审核
【单选题】
AMA94项目经理发展团队会议由于主导讨论的人迟到而中断。若要提高团队会议的效率,项目经理应怎么做?___
A. 使用专业引导师。
B. 认可按时到达的团队成员。
C. 为团队会议设定基本规则。
D. 开展团队建设活动。
【单选题】
AMA95一家跨国公司聘用了一家施工公司来为其全球总部建设一座20层的办公大楼,项目发起人要求办公大楼增加第21层,这层办公楼未在原始计划中,项目经理要求发起人批准标准的项目变更请求。但是,项目发起人拒绝并认为电子邮件批准已经足够充分。下列哪一份文件将避免这种类型的问题?___
A. 定义明确并被批准的变更管理计划
B. 详细的变更请求登记册
C. 详细并批准的工作分解结构
D. 合同签署授权矩阵
【单选题】
AMA96一家跨国公司希望扩张组织。其扩张计划的其中一部分包括在选定地理位置建立一系列分支机构。项目发起人已经草拟了项目章程,现在正在寻求项目经理的帮助,最终确定项目章程的内容。以下是当前版本项目章程的摘录。项目章程摘录:总体目的,扩大公司在成长市场的影响力,向私人客户提供更多的本地接入服务。*目标:-建立多个分支机构。-增加私人客户的数量-提供一系列服务。*高层次风险:-对当地条件、和法规的认识有限,-快速发展的不稳定市场。-大量竞争对手都在关注相同的机会。、、、为了提高验收成功的机会,我们应该怎么样来进一步完善项目章程呢?___
A. 明确该项目的目的,以更好的明确总体目标
B. 制定一套完善的风险应对策略
C. 改进目标,明确每个人的措施和方法
D. 撇开宪章,而是转换到项目管理计划上
【单选题】
AMA98该建设项目的项目经理的申请获得批准变更单,以提供具体的支持。这个变更使用蒙特卡罗模拟分析,但是忽略了天气情况。此外,项目团队成员户外工作的身体伤害风险没有考虑进去。这项工程必须按时完成,因为本地的节日要在此地举行。项目经理接下来应该怎么做?___
A. 接受项目进入违约,并为未按合同规定时间完成范围支付赔偿金
B. 坚持原始计划,并启动变更撤销程序
C. 咨询项目发起人,并与主要相关方会面,寻找替代方案
D. 将这个新情况保留在项目团队内部,并希望天气发生变化,允许完成项目
【单选题】
AMA99项目团队正从客户和项目相关方那里收集所有需求和项目范围。负责该项目的项目经理正在尝试完成项目章程。项目经理应该使用下列哪一项工具和技术? ___
A. 范围分析
B. 专家判断
C. 排列活动顺序
D. 项目进度安排
【单选题】
AMA100在结束项目阶段,需要执行信息编制,作为项目的历史纪录。文件评估了项目的整体成功性,包括项目的优势、劣势、组织以及用于获得结果的技术。这个信息收集过程称作什么? ___
A. 项目相关方的反馈
B. 项目实施后的审计
C. 经验教训
D. 最终项目报告
【单选题】
AMA101项目经理计划为一个建设施工项目采购混凝土。所有供应商的材料质量都一样。只有价格差别。项目经理应向供应商请求哪种应对类型?___
A. 信息请求
B. 建议邀请书
C. 报价邀请书
D. 工作说明书
【单选题】
AMA102客户要求变更项目,这会增加项目风险。你应先做下列哪项?___
A. 在新的成本估算中算进该风险的期望货币值
B. 和客户谈关于该变更的影响
C. 和团队分析变更的影响
D. 变更风险管理计划
【单选题】
AMA103项目经理被要求为两个潜在项目执行成本效益分析。项目A成本为$12亿美元,潜在效益为$60亿美元,未来运营成本为$15亿美元;项目B成本为$14亿美元,潜在效益为$70亿美元,未来运营成本为$1亿美元。项目经理应该推荐哪一个项目?___
A. 项目B;因为潜在效益减去执行成本所得的值大于项目A所得值。
B. 项目A;因为执行成本低于项目B。
C. 项目B;因为潜在效益减去执行成本和未来运营成本所得的值大于项目A。
D. 项目A;因为潜在效益加上未来运营成本所得的值小于项目B所得值。
【单选题】
AMA104项目末期,一项目经理确定该项目增加了4项功能和3项绩效。客户对项目表示满意。这对该项目是否成功来说,是什么意思?___
A. 该项目绝对成功了
B. 该项目没成功,因为它镀金了
C. 该项目没成功,因为客户满意意味着他们为这个项目支付的更多了
D. 该项目成功了,因为团队有机会学习新的功能,客户也很满意
【单选题】
AMA105随着竞争的陡然加剧,一家知名公司的业务开始流失。公司聘请了一名项目经理分析情况并提供纠正措施建议。项目经理研究发现,项目实施过程尤其是风险管理方面存在差距.。没有可用的风险管理计划。项目经理首先应该采取下列哪项行动?___
A. 头脑风暴并识别风险
B. 增加风险预算
C. 实施定性风险评估
D. 制定风险管理活动实施计划
【单选题】
AMA106下列哪一项技术使用了基于“为什么、为什么”以及“如何、如何”图表的信息?___
A. 失效模式与影响分析(FMEA)
B. 纠正和预防措施(CAPA)
C. 根本原因分析
D. 帕累托图
【单选题】
AMA108项目执行过程中,一团队成员告诉项目经理,根据她的研究,项目不能满足所设定的质量标准。于是项目经理和相关各方开会分析当前情况。项目经理正处于质量管理的哪个过程:___
A. 管理质量
B. 质量分析
C. 控制质量
D. 规划质量管理
【单选题】
AMA110项目团队正在制定风险管理计划,本过程采用何种工具和方法确定风险成本因素,并为项目预算和时间表覆盖的活动安排进度?___
A. 会议
B. 经验教训
C. 信息采集方法
D. 风险数据质量评估
【单选题】
AMA111项目进展一半时,项目经理发现在过去几个月中挣值报告有错误,项目经理应该优先考虑的是什么?___
A. 不做任何变更,但是计划与发起人讨论。
B. 与项目相关方讨论未来要采取的行动。
C. 为错误承担责任并且迅速确认纠正措施。
D. 改变进度和计划以保持与挣值报告相同。
【单选题】
AMA112新产品开发项目的一次需求会议上,产品经理提出在以往项目团队中经历的问题。产品经理要求项目经理提供一份计划,详细说明在新项目中如何规避这些问题,项目经理首先应该怎么做?___
A. 召集包括项目经理和产品用户在内的焦点小组会议
B. 与之前的项目团队沟通
C. 与当前的项目团队安排一次头脑风暴会议
D. 查询经验教训知识库
【单选题】
AMA113项目经理想要评估影响生产线效率的各种因素。若要系统性的评估对项目总体成果最有影响的所有关键因素,应使用下列哪一项工具? ___
A. 帕累托分析
B. 标杆对照
C. 实验设计
D. 成本-效益分析
【单选题】
AMA114客户要求项目经理在一星期内让系统上线。系统仍然有些小缺陷,但是项目经理希望满足客户的愿望,让系统按时上线。项目经理应该选择以下哪个风险策略?___
A. 缓解
B. 接受
C. 转让
D. 避免
【单选题】
AMA118项目X已完成60%,落后于进度且超出预算。由于其他更高优先级的项目,项目发起人已经撤出资金,而且部门经理已经将所有团队成员分配给项目Y.项目经理应该怎么做?___
A. 修订项目管理计划,把变化反映在范围中
B. 为项目Y召开一次会议
C. 记录并存档项目X的经验教训
D. 为项目X计算EAC和ETC
【单选题】
AMA119项目经理感觉到项目会议的成效很差,与会者都没做好准备,无法遵照会议议程。项目经理应该怎么做来改变项目团队的态度?___
A. 首先开始改变个人行为,更好地为下一个会议做准备
B. 填写一份关于会议文化和会议规矩的备忘录
C. 在下一次会议开始时讨论做好会议准备的重要性
D. 开展较少但更为重要的会议
【单选题】
AMA120召开项目启动大会的适当时机是什么时候?___
A. 完成初步计划之后,但要在执行之前
B. 在项目经理有正面消息要分享时
C. 在签署项目章程之前
D. 在制定沟通计划之后
【单选题】
AMA121某家公司有一些项目,即项目A,B,C。这些项目是根据公司的目标,按照一套相同的标准划分优先顺序。项目B的优先级较高,因为它将会扩大公司的市场份额,减少对不可靠供应商的依赖性。这是在执行什么活动?___
A. 获得市场份额
B. 项目组合管理
C. 项目启动
D. 项目集管理
【单选题】
AMA122团队成员识别到一个可能对项目成果产生不利影响的技术风险,向项目经理报告。这属于下列哪一项的实例?___
A. 纠正措施
B. 预防措施
C. 缺陷补救
D. 项目更新
【单选题】
AMA123若要产生项目的初步概要定义,供项目业主和参与者规划和衡量项目是否成功,下列哪一项是其中必要过程?___
A. 制定项目工作说明书
B. 制定项目章程
C. 制定WBS
D. 收集需求