【多选题】
Which two configuration options can exclude virtual disks from snapshot operations? (Choose two.)___
A. Use RDM in virtual mode for virtual disk.
B. Use virtual disks in Independent – Persistent mode.
C. Use a virtual disk larger than 2 TB in size.
D. Use RDM in physical mode for virtual disk.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
BD
解析
暂无解析
相关试题
【多选题】
Which two storage configurations on the source server are unsupported with VMware Converter? (Choose two.)___
A. Linux LVM
B. software RAID
C. GPT/MBR hybrid disks
D. Windows basic volumes
E. Windows dynamic volumes
【多选题】
Which two statements about vCenter HA are correct? (Choose two.)___
A. ESXi 5.5 or later is required.
B. vCenter HA network latency between nodes must be less than 50 ms.
C. NFS datastore is supported.
D. It must be deployed on a 3
E. SXi host cluster with DRS enabled.
【多选题】
An attempt to delete NFS datastore from a ESXi host returns the error: Sysinfo error on operation returned the following status:< Busy> Which two statements could explain this failure? (Choose two.)___
A. NFS datastore is a part of Storage DRS Cluster.
B. NFS.VolumeRemountFrequency value is set to 30.
C. Storage I/O Control is enabled on NFS datastore.
D. NFS datastore has running or registered virtual machines.
【多选题】
An administrator finds that the Microsoft Exchange virtual machines are exhibiting network latency. What two in-guest changes can help decrease latency? (Choose two.)___
A. LRO
B. TSO
C. SR-IOV
D. PVRDMA
【多选题】
Which two types of iSCSI adapters require VMkernel networking configuration? (Choose two.)___
A. dependent hardware
B. in-guest
C. software
D. independent hardware
【多选题】
Which two statements are true for NFS v4.1 firewall behavior? (Choose two.)___
A. It closes port 2049.
B. It sets allowed. All flag to TRUE.
C. It sets allowed. All flag to FALSE.
D. It opens port 2049.
【多选题】
A vSphere Administrator attempts to enable Fault Tolerance for a virtual machine but receives the following error: Secondary VM could not be powered on as there are no compatible hosts that can accommodate it. What two options could cause this error? (Choose two.)___
A. The other ESXi host(s) are in Maintenance Mode.
B. Hardware virtualization is not enabled on the other ESXi host(s).
C. The other ESXi host(s) are in Quarantine Mode.
D. Hardware MMU is enabled on the other
E. SXi host(s).
【多选题】
Storage capabilities be populated in what two ways? (Choose two.)___
A. The administrator can use tags to describe capabilities.
B. Default capabilities are provided by vCenter Server.
C. Datastores can advertise their capabilities through VAAI.
D. Datastores can advertise their capabilities through VASA.
【多选题】
In network troubleshooting it is important to know what upstream switch the ESXi host is connected to. Which two features does ESXi provide to help identify the upstream switch? (Choose two.)___
A. Promiscuous mode
B. DPM
C. LLDP
D. CDP
【多选题】
Virtual Volumes supports which three VMware features? (Choose three.)___
A. Instant Clones
B. Distributed Resource Scheduler
C. Linked Clones
D. vMotion
E. Storage Distributed Resource Scheduler
【多选题】
vSphere DRS helps to balance virtual machines with available resources in a vSphere cluster. What three types of resources can be taken into account for balancing? (Choose three.)___
A. CPU
B. physical NIC saturation of an ESXi host
C. virtual NIC saturation of a virtual machine
D. RAM
E. storage latency
【多选题】
Which three design requirements must be satisfied to enable RAID-6 objects in a VMware vSAN cluster? (Choose three.)___
A. vSAN Advanced license or higher
B. vSAN stretched cluster
C. at least six hosts contributing storage
D. deduplication and compression
E. all flash configuration
【多选题】
When using "Cluster resource percentage" for host failover capacity in vSphere HA Admission Control, the total resource requirements are calculated from which two values? (Choose two.)___
A. Total vCPUs assigned to each VM.
B. Average CPU usage on each VM over time.
C. Memory reservations on each VM.
D. Total memory assigned to each VM.
E. Average active memory on each VM over time.
F. CPU reservations on each VM.
【多选题】
Which are four attributes of the Active vCenter HA node? (Choose four)___
A. It uses the vCenter HA network to communicate with the Witness node.
B. It constantly replicates vPostgres data with the Witness node.
C. It uses a public IP address for the management interface.
D. It runs the active vCenter Server Appliance instance.
E. It uses the vCenter HA network for replication of data to the Passive node.
F. It provides a quorum to protect against split-brain situations.
【多选题】
Which are two vCenter Server two-factor authentication methods? (Choose two.)___
A. RSA SecurID
B. Smart Card
C. SAML
D. Symantec VIP
【多选题】
An administrator is creating VMkernel adapters on an ESXi 6.5 host and wants to create separate VMkernel adapters for every type of traffic in the default TCP/IP stack. Which three types of traffic can be explicitly enabled on a separate VMkernel adapter? (Choose three.)___
A. Virtual SAN traffic
B. NFS traffic
C. vMotion traffic
D. vSphere HA traffic
E. Fault Tolerance logging traffic
【多选题】
When migrating a Windows vCenter Server 6.0 to the vCenter Server Appliance 6.5, which two will be migrated by default? (Choose two.)___
A. Local Windows OS users and groups
B. Configuration
C. Custom ports
D. FQDN
E. Historical and Performance data
【多选题】
Which three types of Content Libraries exist within vSphere 6.5? (Choose three.)___
A. Remote Content Library
B. Published Content Library
C. Local Content Library
D. Shared Content Library
E. Subscribed Content Library
【多选题】
An administrator cannot enable multi-processor Fault Tolerance (SMP-FT) for a virtual machine. Which are two possible causes for this? (Choose two.)___
A. The virtual machine is running on a vSAN datastore.
B. The Fault Tolerance network is using a 10Gbit uplink.
C. The virtual machine has 6 vCPUs assigned.
D. The virtual machine has a 1TB VMDK attached.
E. The virtual machine has snapshots present.
【多选题】
Which two statements are true for Predictive DRS? (Choose two.)___
A. It balances resource utilization for virtual machines with unpredictable utilization patterns.
B. It integrates DRS with vRealize Operations Manager to balance workloads for virtual machines before resource utilization spikes occur.
C. It balances resource utilization based on a threshold's algorithm that runs each night.
D. It determines the best placement and balance of virtual machines based on a threshold's algorithm that runs each night in vCenter Server 6.5 Database.
【多选题】
Which two situations could cause a virtual machine to appear with (orphaned) appended to its name? (Choose two.)___
A. if a host failover is unsuccessful
B. if a virtual machine was removed from vCenter Server's inventory
C. if a virtual machine was deployed from template, and the template has been deleted
D. if a virtual machine is unregistered directly on the host
【多选题】
Which three requirements are needed to apply RAID 5 or RAID 6 erasure coding on a vSAN 6.2 or 6.5 object? (Choose three.)___
A. on Disk Format 3.0
B. Hybrid vSAN
C. All Flash vSAN
D. vSAN Advanced License
E. Stretched Cluster Configurations
【多选题】
An administrator sees the following error in the log files: Which two events could be the source of the error message? (Choose two.)___
A. vCenter Server failure
B. VXLAN failure
C. Disk array failure
D. Network failure
E. ESXi host failure
【多选题】
An administrator is attempting to access an ESXi host via the DCUI but is unable to do so. Which could be two possible causes? (Choose two.)___
A. The host in Qhas no out-of-band management capability (i.e. iLO/iDRAC).
B. The SSH service is disabled on the host.
C. Strict lockdown mode is enabled on the host.
D. Normal lockdown mode is enabled and the administrator is a member of the
E. xception User list.
【多选题】
Which two permissions are required to migrate a virtual machine with Storage vMotion? (Choose two.)___
A. Network > Move Network
B. Virtual Machine > Inventory > Move
C. Resource > Migrate powered on virtual machine
D. Datastore > Allocate Space
【多选题】
Which are three supported storage requirements for vCenter Server HA? (Choose three.)___
A. NFS
B. RDM
C. vSAN
D. VMFS
E. JBOD
【多选题】
Which are the two network requirements for a VMware vSAN 6.5 cluster? (Choose two.)___
A. Multicast must be enabled on the physical switches and routers that handle vSAN traffic.
B. vSAN requires IPv6 only.
C. All hosts must have a dedicated 40GbE NIC.
D. The vSAN network supported IPv4 or IPv6.
E. vSAN requires IPv4 only.
【多选题】
Which three prerequisites must be in place prior to enabling secure boot for a virtual machine? (Choose three.)___
A. VirtualMachine.Config.Settings privileges
B. an encrypted USB drive
C. Virtual Hardware version 13 or later
D. Virtual Hardware version 12 or later
E. EFI firmware
【多选题】
A user is given the "Virtual machine user (sample)" role in a vSphere 6.x environment. Which three permissions would the user be able to perform? (Choose three.)___
A. Reset a virtual machine.
B. Power on a virtual machine.
C. Move a host into a cluster.
D. Configure CD media.
E. Migrate a virtual machine with Storage vMotion.
【多选题】
Which three are supported upgrade processes for ESXi host? (Choose three.)___
A. using vSphere Auto Deploy
B. using a TFTP server
C. using Update Manager
D. using an
E. SXCLI command
【多选题】
When enabling Storage DRS on a datastore cluster, which three components are enabled as a result? (Choose three.)___
A. Space load balancing among datastore within the datastore cluster.
B. Initial placement for virtual disks based on space and I/O workload.
C. I/O load balancing among datastores within the datastore cluster.
D. Queue Depth alerting on disks within the datastore cluster.
E. Data de-duplication within the datastore cluster.
【多选题】
What are two features introduced in Network I/O Control version 3? (Choose two.)___
A. Bandwidth reservation per traffic type
B. Network resource pools
C. CoS tagging
D. Bandwidth guarantee to virtual machines
【多选题】
Which two correct virtual machine advanced configuration parameters will accomplish this? (Choose two.)___
A. isolation.device.edit.disable = “FALSE”
B. isolation.device.edit.disable = “TRUE”
C. isolation.device.connectable.disable = “FALSE”
D. isolation.device.connectable.disable = “TRUE”
【多选题】
Which three statements are correct regarding booting an ESXi Host from Fibre Channel SAN? (Choose three.)___
A. Direct connect topology is supported.
B. Each host must have its own boot LUN.
C. ESXi hosts do not require local storage.
D. Multipathing to a boot LUN on an active-passive array is supported.
E. Hosts can share one common boot LUN.
【多选题】
Which two tasks should a vSphere administrator perform if the vmkernel log reports VMFS metadata errors? (Choose two.)___
A. contact VMware technical support
B. reformat the datastore
C. check the device with VOMA
D. ignore the messages
【多选题】
Which two statements are true for a vCenterServer user account that is used for vSphere Data Protection (VDP)? (Choose two.)___
A. The user account must be assigned with Administrator role.
B. The password for the user account cannot contain spaces.
C. The user account should be created in the Single Sign-On domain
D. The user account cannot inherit required permissions from a group role.
【多选题】
Which three storage protocols are supported by Virtual Volumes? (Choose three.)___
A. FCIP
B. FCoE
C. iSCSI
D. NFS v3
E. NFS v4
【多选题】
A vSphere administrator observes a CPU spike on one of the web servers (view the Exhibit.) Which two statements can describe the cause of this activity? (Choose two.)___
A. The network packet size is too large.
B. VMware Tools is not installed.
C. Disk latency is present on the datastore.
D. The network packet size is too small.
【多选题】
Which three operations can cause VMFS metadata updates? (Choose three.)___
A. Restarting a VM using the guest OS.
B. Launching a VM console.
C. Migrating a VM with vMotion.
D. Powering a VM on or off.
E. Expanding a VMFS datastore.
【多选题】
*What two services run on all nodes in a vCenter Server HA cluster? (Choose two.)___
A. vmware-vmon
B. vmware-vpostgres
C. vmare-rbd-watchdog
D. vmware-vcha
推荐试题
【单选题】
BXC5、在项目执行期间,项目发起人通知项目经理,现金流制约因素己经导致原始预算资金不可用。项目发起人修改资金可用性,并要求项目经理继续执行已减少活动的项目。项目经理首先应该做什么?___
A. 生成变更请求
B. 更新工作分解结构(WBS)
C. 更新项目管理计划
D. 接受请求并继续执行项目
【单选题】
BXC6、项目团队正在努力确定项目管理计划范围基准组成部分。应将哪份文件包含在内?___
A. 工作分解结构(WBS)字典
B. 风险管理计划
C. 成本管理计划
D. 范围管理计划
【单选题】
BXC7、项目任务如下:任务A(持续时间4天);任务B(持续时间3天);任务C(持续时间4天);任务D(持续时间2天);任务E(持续时间3天);任务F(持续时间4天)。任务D和任务F只能在任务C结束后开始。任务A和任务B可以在任务C开始后的任何时间内开始,但是必须在项目结束前完成。任务E只能在任务D完成后开始。任务B是在任务C开始一天后才开始的,在执行任务B过程中,发生了一件例外事项,导致该任务延期2天。为了确保项目按时完成,应采取什么措施?___
A. 为任务B添加更多的资源
B. 为关键路径上的任务重新分配资源
C. 为任务D添加更多的资源
D. 不需要采取任何措施
【单选题】
BXC8、项目经理承担一家公司的一个项目管理,但该公司正在进行组织变更且即将重组。若要确保该项目与该公司的目的和目标保持一致,项目经理应该怎么做?___
A. 获得项目章程的批准
B. 在项目启动大会上达成协议
C. 按照商业论证进行差距分析
D. 按照该公司的使命、愿景和价值观分析该项目
【单选题】
BXC9、公司决定与一个供应商签署一份固定总价(FFP)合同,实施一个在线银行系统。这使用的是什么风险应对策略?___
A. 转移
B. 回避
C. 开拓
D. 接受
【单选题】
BXC10、项目经理从一家公司的高级管理层收到一份商业论证,该公司之前曾有在项目执行阶段中途放弃项目且不能提供足够要求资源的历史。项目经理应该怎么做?___
A. 制定工作分解结构(WBS)。
B. 制定项目章程。
C. 制定项目管理计划。
D. 制定战略计划。
【单选题】
BXC11、在测试期间发现了多个产品缺陷,项目经理应使用下列哪项工具或技术为这些缺陷排列优先顺序?___
A. 控制度
B. 帕累托图
C. 偏差分析
D. 粗略量级估算(ROM)
【单选题】
BXC12、项目经理审查进度绩效,并计算出已完成工作的实际成本(AC)是220,成本偏差(CV)为-20,以及计划价值为180。项目的进度偏差(SV)是多少?___
A. -40
B. -20
C. 20
D. 40
【单选题】
BXC13、一位顾问告知项目经理,一名内部客户资源正在为项目工作,并希望获知项目状态。哪份文件应更新?___
A. 组织图
B. 采购合同
C. 沟通管理计划
D. 会议记录
【单选题】
BXC14、由于必要的资源不可用,项目经理无法执行项目。项目经理担忧项目临近结束,却未完成可交付成果。项目经理应该怎么做?___
A. 查阅风险登记册
B. 更新工作分解结构(WBS)
C. 更新项目管理计划
D. 上报给项目相关方
【单选题】
BXC15、一家制造公司为一条新产品生产线识别需求。公司应该怎么做来验证这个需求?___
A. 制定项目管理计划
B. 申请资金
C. 完成商业论证
D. 销售新产品
【单选题】
BXC16、由于个人原因,一名项目团队成员通知项目经理将不能工作两周时间,该团队成员是能够执行一项关键路径任务的唯一资源。项目经理应首先更新哪一份文件?___
A. 工作分解结构
B. 风险登记册
C. 人力资源管理计划
D. 项目进度计划
【单选题】
BXC17、职能经理需要知道分配给某个项目的某些资源何时可以分配到其它任务上。项目经理应该向职能经理提供什么文件?___
A. 人员解散计划
B. 资源日历
C. 责任分配矩阵(RAM)
D. 人员招募计划
【单选题】
BXC18、在漫长的延期后,生产线重新启动。若要核实产品是否仍然满足要求的技术规范,项目经理应该使用什么工具或技术?___
A. 因果图
B. 实验设计
C. 专家判断
D. 检查
【单选题】
BXC19、为了在不断变化的环境中生存下来,公司必须制定项目管理文化。过去,该组织的愿景主要受供应部门驱动。然而,作为关键项目相关方的供应部门副总裁却拒绝采用新文化.如何能够获得对这种新文化的一致认可?___
A. 邀请供应部门副总裁参加项目会议
B. 与供应部门副总裁谈话,确定问题的根本原因
C. 给供应部门副总裁开辅导课
D. 让管理层安排一次所有项目相关方参与的战略会议
【单选题】
BXC20、项目经理刚刚被任命管理项目A,了解到由于人力资源不足,项目落后于进度。经济制约因素阻碍了公司招募新员工。但是,项目经理发现项目B即将完工。若要确保项目A按进度计划交付,项目经理应该怎么做?___
A. 等到项目B完工,然后分配资源给项目A
B. 协商并影响需要的资源
C. 要求项目B的团队成员为项目A工作
D. 要求项目A的团队成员加班工作
【单选题】
BXC21、一家公司作为一个由政府发起的基础设施开发项目执行组织。最近选举后,所有正在进行的政府发起的基础设施项目均被搁置审查。项目经理应该更新哪份项目文件?___
A. 范围管理计划
B. 问题日志
C. 风险登记册
D. 项目进度计划
【单选题】
BXC22、项目经理接管了一个苦苦挣扎的项目,了解到团队对前任项目经理与他们的互动方式感到失望。团队对前任项目经理在没有团队参与的情况做出关键决策感到担忧。哪种激励理论描述的是前任项目经理?___
A. Y理论
B. 马斯洛需求层次理论
C. 激励-保健理论
D. X理论
【单选题】
BXC23、一名相关方抱怨说未收到项目延期交付的通知,若要防止这个问题,项目经理应该事先做什么?___
A. 更新需求跟踪矩阵
B. 审查沟通管理计划
C. 审查风险管理计划
D. 更新相关方登记册
【单选题】
BXC24、项目经理希望执行预测,确定项目是否满足其成本和进度目标。哪个来源将提供创建这项预测的信息?___
A. 工作绩效信息
B. 工作绩效报告
C. 工作绩效数据
D. 工作绩效基准
【单选题】
BXC25、新软件必须在一个确切的、不可协商的日期制造完成,且不能变更范围和成本。项目前几个阶段的可交付成果已经延迟。在制造软件之前,项目经理应使用什么来制定测试阶段的进度计划?___
A. 赶工
B. 快速跟进
C. 风险控制
D. 质量控制
【单选题】
BXC26、一名项目资源错过分配任务的期限。该资源抱怨说其主管分配了额外任务。项目经理应该怎么做?___
A. 向该资源提出书面警告
B. 聘用额外的资源
C. 与该资源及其主管一起分析情况
D. 与项目管理办公室(PMO)一起确定项目优先次序
【单选题】
BXC27、一名关键相关方担心下一个工作包的交付以及与下个阶段相关的成本。项目经理可以从哪里找到这个信息?___
A. 问题日志报告
B. 采购工作说明书(SOW)
C. 工作绩效报告
D. 控制图
【单选题】
BXC28、在一个设备升级项目期间,项目经理要求供应商每周提供进度报告。该供应商提出只需提交一份最终报告即可。若要核实这一点,应该查阅哪一份文件?___
A. 执行、负责、咨询和知情(RACI)矩阵
B. 工作分解结构(WBS)
C. 沟通管理计划
D. 协议
【单选题】
BXC29、在一次头脑风暴会议期间,项目团队制定了一系列应对策略,以减轻在新办公楼调试阶段电源故障的影响。选择最佳战略时,项目经理应考虑什么?___
A. 最低成本
B. 易于实施
C. 成本效益
D. 能够提供快速结果
【单选题】
BXC30、一名新项目经理负责管理一个正在进行中的项目,其中50%的项目团队成员均属于外包。项目经理发现外包团队成员交付的生产文档与公司标准不符。项目经理应该怎么做?___
A. 审查人力资源管理计划,教育这些资源遵循公司标准
B. 遵循采购文件中描述的行动
C. 开展绩效评估,然后开始终止过程
D. 将工作重新分配给熟悉公司标准的团队成员
【单选题】
BXC31、在团队会议期间,团队成员提出之前识别的风险应关闭。项目经理应该怎么做?___
A. 使用专家判断
B. 安排定期风险再评估
C. 开展根本原因分析
D. 执行定性风险分析
【单选题】
BXC32、公司计划投资100万美元开发一项新产品。根据可行性研究,新产品将在第一年创造30万美元的收入,在随后两年每年创造40万美元的收入。根据折现率为10%的假设条件,项目的净现值(NPV)和可行性情况如何?___
A. NPV为正的,可行性为负的
B. NPV为负的,可行性为负的
C. NPV为正的,可行性为正的
D. NPV为负的,可行性为正的
【单选题】
BXC33、在一个虚拟组织中,应事先完成下列哪一项来管理规划阶段的项目信息流?___
A. 制定结构化的沟通管理计划
B. 制定正式的沟通渠道
C. 组建一支在相同时区工作的人员团队
D. 审查过往虚拟项目的经验教训
【单选题】
BXC34、项目团队由多名团队成员组成,一些成员积极参与项目,而另一些成员却比较消极。若要获得识别风险的最佳结果,项目经理应该使用哪一项工具或技术?___
A. 专家判断
B. 德尔菲技术
C. 三点估算法
D. 调查
【单选题】
BXC35、一名团队成员不遵守任务交付时间,过去三次项目状态会议都迟到。这影响到项目关键路径。项目经理应该怎么做?___
A. 与该团队成员私下谈谈
B. 将该团队成员从关键路径任务上移除
C. 在下一次项目状态会议上解决该问题
D. 忽视该问题
【单选题】
BXC36、一项关键活动的专用、专业资源要求从下个月开始在家里工作。项目要求该团队成员未来三个月在现场工作。项目经理应该怎么做?___
A. 向管理层要求替换
B. 与团队成员的经理讨论该问题
C. 分析该团队成员不在现场工作的影响
D. 立即与团队成员讨论该问题
【单选题】
BXC37、项目经理将与三名社区成员和三名内部客户沟通。项目将有多少个沟通渠道?___
A. 10
B. 15
C. 21
D. 36
【单选题】
BXC38、一项新产品需要导致成本的广泛召回。若要降低召回几率,项目经理应该怎么做?___
A. 进行在制品检查
B. 实行严格的采购过程
C. 办理保险
D. 遵守风险管理过程
【单选题】
BXC39、项目经理收到项目章程,并安排召开一次初步项目启动大会。然而,参加这次会议的公司资源很少。若要避免这个问题,项目经理应该考虑哪一点?___
A. 组织过程资产
B. 事业环境因素
C. 协议
D. 沟通管理计划
【单选题】
BXC40、在项目结束时,项目经理发现已批准的范围中遗漏多项法规要求,因此导致未解决。项目经理下一步应该怎么做?___
A. 提出一项变更请求,解决这些要求
B. 指示团队成员在项目收尾之前进行变更
C. 开始一个新项目,将这些要求作为范围
D. 使用管理储备来解决这些要求
【单选题】
BXC41、项目经理正在规划一个大型采购活动,希望在提交建议书之前与所有潜在供应商沟通。项目经理使用什么工具或技术?___
A. 投标人会议
B. 卖方投标分析
C. 自制或外购分析
D. 采购审计
【单选题】
BXC42、一个工期短的小项目要求从外部供应商采购钢棒。虽然双方共同约定了钢棒的单价,但不可能有任何信心确定钢棒数量或项目持续时间。这应该使用哪一个合同类型?___
A. 固定总价合同(FFP)
B. 成本加固定费用合同(CPFF)
C. 成本加激励费用合同(CPIF)
D. 工料合同(T&M)
【单选题】
BXC43、项目经理发现项目的挣值(EV)小于计划价值(PV),且其EV大于其实际成本(AC)。为满足计划的进度和预算要求,项目经理应该怎么做?___
A. 解散一些资源
B. 提交范围变更请求
C. 应用资源平滑
D. 考虑快速跟进
【单选题】
BXC44、项目经理决定将一些任务分包给外部服务提供商。哪个过程能确保服务提供商的绩效满足合同要求?___
A. 控制图
B. 控制采购
C. 采购谈判
D. 合同变更控制系统