【判断题】
二战以后,在国共问题上,美国奉行中立政策,要求国民党和共产党和平解决政治纷争,反对国民党政府打内战。
A. 对
B. 错
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
B
解析
暂无解析
相关试题
【单选题】
A vSphere content library administrator is attempting to unpublish the content library, but the option is grayed out as shown in the Exhibit. Which statement identifies the reason for not being able to unpublish? ___
A. The content library is optimized for syncing over HTTP.
B. A synchronization operation is in progress with this content library.
C. There are active subscriptions on this content library.
D. Underlying storage for this content library is not accessible.
【单选题】
Assuming a mirrored (RAID-1) object configuration, how many hosts must contribute storage in a non-stretched VMware vSAN cluster to satisfy the “Number of failures to tolerate” policy option?“n” is the desired “Number of failures to tolerate” value for all options.___
A. 2n+2
B. 2n
C. 2n+1
D. 3n
【单选题】
An administrator must change the statistics level for short-term performance monitoring and wants to collect metrics for all counters, excluding minimum and maximum rollup values. What would be the statistics level?___
A. Level 3
B. Level 1
C. Level 2
D. Level 4
【单选题】
In a vSphere environment, two resource pools are created as shown in the Exhibit. Each VM is configured with 1 GB of memory. When the administrator tried to power on VM3, the operation failed. What action in the resource pool settings will allow VM3 to power on successfully?___
A. Deselect Expandable Memory Reservation
B. Increase Memory Reservation
C. Deselect Expandable CPU Reservation
D. Increase the CPU Reservation
【单选题】
Which network is used by vSphere HA when VMware vSAN is enabled?___
A. Management network
B. vSphere Replication network
C. vMotion network
D. VSAN network
【单选题】
Which statement is correct when migrating from a Windows vCenter Server to the vCenter Server Appliance 6.5?___
A. Migration deployments do not migrate local OS users from the source vCenter Server.
B. Migration deployments support DHCP on the source vCenter Server.
C. Migration deployments allow the source vCenter Server to remain powered on afterwards.
D. Migration deployments support custom ports for all services on the source vCenter Server.
【单选题】
How can failback of a recovered virtual machine in vSphere Replication be performed?___
A. No action required, because failback is automatically performed to the source site.
B. Configure a new replication in the reverse direction at the target site.
C. Disable or Stop the virtual machine replication on the source site.
D. Power off and unregister the virtual machine on the target site.
【单选题】
After upgrading the vSphere infrastructure and VMware Tools to version 6.5, the “Upgrade VM Compatibility” option is grayed out in the vSphere Web Client. (See Exhibit.) What must the administrator do to enable the VM compatibility upgrade?___
A. VMware Tools should be upgraded last.
B. Restart the ESXi server.
C. Uninstall VMware Tools.
D. Power off the virtual machine.
【单选题】
What availability mode does vCenter HA provide?___
A. Active-Passive
B. Active-Standby
C. Active-Active
D. Load-balanced
【单选题】
In which scenario will vSphere DRS balance resources when set to Fully Automated?___
A. Hosts with only shared storage
B. Hosts are part of a vSphere HA cluster
C. Power Management is set to Balanced on hosts
D. Hosts with shared or non-shared storage
【单选题】
What VMware technology can be used to move physical servers to the vSphere infrastructure?___
A. VMware vMotion
B. VMware Converter
C. VMware vCenter Server
D. OVF transport
【单选题】
Upgrading vCenter Server with Microsoft SQL database fails with the following error message: The DB User entered does not have the required permissions needed to install and configure vCenter Server with the selected DB. Please correct the following error(s): %sWhat could cause this error?___
A. incorrect ports open on SQL Server
B. incorrect database on the SQL server
C. incorrect compatibility mode on the SQL server
D. incorrect permission on SQL Server database
【单选题】
What is a potential downside of having more than four paths per datastore?___
A. limits the storage protocols
B. increases storage latency for VM
C. limits the path selection policies
D. limits the number of LUNs per host
【单选题】
Which feature facilitates the sharing of templates via vCenter Server?___
A. Content Library
B. OVF
C. folders
D. vApp
【单选题】
A vSphere Administrator is in the process of configuring replication for a virtual machine, but is not able to select the Recovery Point Objective (RPO) value of 5 minutes. Which statement could explain why the RPO value cannot be lower than 15 minutes?___
A. The OS quiescing option is selected for Replication options.
B. The virtual machine hardware version is not compatible.
C. The target and source sites use different types of datastores.
D. The target and source sites are not using VMFS 6.0 datastore.
【单选题】
What advanced parameter defines a custom isolation IP address for a vSphere HA cluster?___
A. das.usedefaultisolationaddress
B. das.isolationshutdowntimeout
C. fdm.isolationpolicydelaysec
D. das.isolationaddress
【单选题】
Which method is supported for backing up the virtual machine that contains vCenter Server?___
A. differential
B. incremental
C. full image
D. individual disks
【单选题】
A vSphere Administrator must ensure that a user is able to view and manage the system configuration in vSphere Web Client. In the vCenter Single Sign-On domain, which group should the user be a part of?___
A. SystemConfiguration.BashShellAdministrators
B. ComponentManager. Administrators
C. Administrators
D. SystemConfiguration.Administrators
【单选题】
What is the minimum number of hosts that must contribute capacity to a non-ROBO single site VMware vSAN cluster?___
A. 1
B. 64
C. 3
D. 2
【单选题】
Which guest operating system supports PVRDMA?___
A. Windows (32-Bit)
B. Linux (32-Bit)
C. Windows (64-Bit)
D. Linux (64-Bit)
【单选题】
What is the correct way to replace the certificate on an existing vCenter Server that is part of a vCenter HA configuration?___
A. Put the vCenter HA in Maintenance mode, replace the certificate, exit Maintenance mode.
B. Shut down Passive and Witness nodes and replace the certificate on the Active node.
C. Remove the Passive and Witness nodes, replace the certificate, reconfigure the cluster.
D. Replace the certificate while all nodes are participating in the cluster.
【单选题】
The vSphere Data Protection performance analysis results in the “Conditionally Passed” status. What can cause this condition?___
A. The results did not meet the minimum performance expectations.
B. The read, write, and seek tests were successful.
C. The read and write tests were successful but the seek test failed.
D. The read and write tests were successful but the seek test skipped.
【单选题】
A vSphere Administrator wants to reserve 0.5 Gbps for virtual machines on each uplink on a disturbed switch that has 10 uplinks. What is the quota that should be reserved for the network resource pool?___
A. 10 Gbps
B. 5 Gbps
C. 100 Gbps
D. 0.5 Gbps
【单选题】
A vSphere administrator manages a cluster which includes critical and non-critical virtual machines. The cluster requires different permissions for contractors and non-contractors. How can the administrator exclude the contractor group from some of the critical VMs?___
A. Apply permission for both contractors and non-contractors on the cluster level.
B. Apply permission for both contractors and non-contractors on the cluster level. Remove permission on the critical VMs for contractors.
C. Remove permission for contractors on the cluster level. Apply permission on the critical VMs for noncontractors.
D. Apply permission for both contractors and non-contractors on the VMs. Remove permission on the critical VMs for contractors.
【单选题】
In an ESXi 6.5 cluster only "NFS datastore has running or registered virtual machines" returns. A vSphere HA cluster with four hosts has admission control configured to tolerate one host failure. Which statement is true if a fifth host is added?___
A. CPU and Memory capacity will be set to 50%.
B. CPU and Memory capacity will be set to 30%.
C. CPU and Memory capacity will be set to 25%.
D. CPU and Memory capacity will be set to 20%.
【单选题】
Which command can be run to troubleshoot connectivity problems with vmkernal network interfaces?___
A. esxcli network
B. vmkping
C. net-status
D. vicfg-vmknic
【单选题】
What counter should an administrator check to determine if a virtual machine is ballooning?___
A. swapinRate
B. vmmemctltarget
C. swapped
D. vmmemctl
【单选题】
By default, how often is the vCenter vpx user password automatically changed?___
A. 15 days
B. 60 days
C. 30 days
D. 45 days
【单选题】
Which metric in the Exhibit would identify high latency for a virtual machine operating system?___
A. QAVG/cmd
B. KAVG/cmd
C. DAVG/cmd
D. GAVG/cmd
推荐试题
【多选题】
项目需求库的建设应以( )为原则,落实《配电网技术导则》、《配电网规划设计技术导则》等技术原则,综合考虑配电网现状、运维状况、用电需求等因素。 ___
A. 统一规划
B. 统一标准
C. 安全可靠
D. 坚固耐用
【多选题】
建设管理单位应按照物资的( )等管理制度,建立台帐和单据。严格监控施工单位设备材料的使用、结存管理,及时回收剩余设备材料。___
A. 入库
B. 出库
C. 发放
D. 领用
E. 结存
【多选题】
建设管理单位应明确配电网工程设计、施工、监理、业主单位的档案管理职责和档案资料的收集范围,做好配电网工程项目文件材料的形成、积累、整理、移交、归档和保管使用工作,保证工程档案的( ),同步形成电子档案。___
A. 完整性
B. 准确性
C. 真实性
D. 规范
【多选题】
在废旧物资管理中,( )为竣工报告必备资料。若出现应收、拆除、实收数量、种类不相符情况的,由监理单位提供具体的原因说明。___
A. 废旧物资技术鉴定表
B. 项目拆旧清单
C. 废旧物资交接单
D. 废旧物资报废手续
【多选题】
导线的连接,应符合下列哪些规定( )。___
A. 不同金属、不同规格、不同绞向的导线,严禁在档距内连接
B. 在同一档距内,每根导线不应超过一个连接头
C. 档距内接头距导线的固定点的距离,不应小于0.5m
D. 铜绞线与铝绞线的跳线连接,宜采用铜铝过渡线夹、铜铝过渡线
E. 档距内接头距导线的固定点的距离,不应小于0.7m
【多选题】
直埋敷设电缆方式,应符合哪些规定( )。___
A. 电缆应敷设于壕沟里,并应沿电缆全长的上、下紧邻侧铺以厚度不小于100mm的软土或砂层
B. 沿电缆全长应覆盖宽度不小于电缆两侧各50mm的保护板,保护板宜采用混凝土
C. 城镇电缆直埋敷设时,宜在保护板上层铺设醒目标志带
D. 位于城郊或空旷地带,沿电缆路径的直线间隔100m、转弯处和接头部位,应竖立明显的方位标志或标桩
E. 当采用电缆穿波纹管敷设于壕沟时,应沿波纹管顶全长浇注厚度不小于100mm的素混凝土,宽度不应小于管外侧50mm,电缆可不含铠装
【多选题】
下面属于土建施工要求的是:___
A. 土方开挖应做好排水、降水措施,按照放坡要求开挖
B. 电缆埋管深度符合要求,预留管必须封盖,防止堵塞
C. 混凝土施工必须采用机械震捣
D. 砌体工程应砂浆饱满,上下错缝,不得出现通缝现象
【多选题】
下列哪些属于线路安装质量要求:___
A. 杆(塔)组立,线路架设,柱上开关、刀闸、避雷器及附件安装符合设计要求
B. 导、引线连接可靠,同一档内每根导、地线上只允许有一个接续管,安装部位符合规范
C. 防火、防小动物措施规范齐全
D. 线路名称、编号、标识牌及警示牌齐全
【多选题】
架空线路施工前现场检查应包括___
A. 钢筋混凝土电杆表面应光洁平整, 壁厚均匀, 无露筋、 偏筋、漏浆、掉块等现象。
B. 钢筋混凝土电杆杆顶应封堵。
C. 钢管杆及附件均应热镀锌,锌层均匀, 无漏锌、 锌渣、 锌刺。
D. 铁塔塔材尺寸、螺栓孔允许偏差合格,镀锌表面应连续、完整, 不应有过酸洗、 起皮、 漏镀等使用上有害的缺陷。
【多选题】
螺母拧紧后,螺杆露出螺母的长度下列说法正确的是( )。___
A. 对单螺母,不应小于两个丝扣
B. 对单螺母,应最少与螺母相平
C. 对双螺母,应最少与螺母相平
D. 对双螺母,不应小于两个丝扣
【多选题】
下列单回路混凝土电杆的埋深深度正确的是( ). ___
A. 杆长8米,埋深1.5
B. 杆长9米,埋深1.7
C. 杆长10米,埋深1.8
D. 杆长12米,埋深1.9
E. 杆长15米,埋深2.3
【多选题】
拉线的安装应符合下列规定( ).___
A. 36KV~66KV架空电力线路不应大于2°
B. 10KV及以下架空电力线路不应大于5°
C. 特殊地段应符合设计要求
D. 承力拉线应与线路方向的中心线对正
E. 防风拉线应与线路方向垂正
【多选题】
关于以下说法正确的有( )。___
A. 直线杆顺线路方向位移不应超过设计档距3%
B. 直线杆横线路方向位移不应超过0.1米
C. 不同金属、不同规格和绞向的导线在一个耐张段内不得连接
D. 横担安装上下斜歪、左右扭斜不得大于0.05米
E. 拉线与电杆夹角应在在30º~60º之间