【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
D
解析
暂无解析
相关试题
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
A. 6
B. 7
C. 10
D. 11
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
【单选题】
Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? ___
A. The Orphaned virtual machines have HA restart disabled.
B. The Orphaned virtual machines moved recently and the change did not persist.
C. The host is attached to failed storage.
D. The host just came out of maintenance mode.
【单选题】
Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【多选题】
An application running in a virtual machine is experiencing performance issues. When utilizing performance monitoring utilities, it is noted that the CPU Utilization of the application is at 100%. Which two scenarios are probable causes of the CPU contention for the application? (Choose two.)___
A. There is a network I/O constraint.
B. There is a storage I/O constraint.
C. There is insufficient disk space assigned to the virtual machine.
D. The application is not virtualization aware.
【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
推荐试题
【判断题】
电压互感器的熔丝熔断时,备用电源的自动装置不应动作
A. 对
B. 错
【判断题】
在一次系统发生故障或异常时,要依靠继电保护和自动装置将故障设备迅速切除
A. 对
B. 错
【判断题】
共基极电路特点是输入阻抗较小,输出阻抗较大,电流、电压和功率的放大倍数以及稳定性与频率特性较差
A. 对
B. 错
【判断题】
最大值是正弦交流电在变化过程中出现的最大瞬时值
A. 对
B. 错
【判断题】
输出电路与输入电路共用发射极,简称共发射极电路
A. 对
B. 错
【判断题】
晶体管的电流分配关系是:发射极电流等于集电极电流和基极电流之和
A. 对
B. 错
【判断题】
人体触电时,电流流经人体的途径不同会引起不同的伤害,通过中枢神经会引起人立即昏迷
A. 对
B. 错
【判断题】
为确保安全,户外变电装置的围墙高度一般应不低于三米
A. 对
B. 错
【判断题】
钳表是用电流互感器的原理制造的,所以只能用来测量交流电流
A. 对
B. 错
【判断题】
磁电式仪表由固定的永久磁铁、可转动的线圈及转轴、游丝、指针、机械调零机构等组成
A. 对
B. 错
【判断题】
测量直流电流时,电流表应与负载串联在电路中,并注意仪表的极性和量程
A. 对
B. 错
【判断题】
某一段时间内负载消耗的电能可以用电度表来测量
A. 对
B. 错
【判断题】
绝缘电阻可以用接地电阻测量仪来测量
A. 对
B. 错
【判断题】
接地电阻测量仪主要由手摇发电机,电流互感器,电位器以及检流计组成
A. 对
B. 错
【单选题】
我国的上海银行间同业拆放利率(Shibor)是由信用等级较高的数家银行组成报价行确定的-个算数平均利率,其确定依据是报价行__________
A. 报出的回购协议利率
B. 报出的人民币同业拆出利率
C. 报出的外币存款利率
D. 持有的国库收益率
【单选题】
利率期货以()作为交易的标的物。___
A. 浮动利率
B. 固定利率
C. 市场利率
D. 固定利率的有价证券
【单选题】
中国人民银行宏观调控工具中,作为一种基础货币投放渠道,通过商业银行抵押资产从央行获得融资,引导中期利率的储备政策工具是__________
A. SLF(StandingLengingFacility)
B. PSL(PledgedSupplementaryLenging)
C. (Medium-termLengingFacility)
D. SLO(Short-termLiquidityOperations)
【单选题】
如果我国人民币实现国际化,被其他国家作为储备货币,则我国就成为储备货币发行国。到那时,我国的国际储备就可以_____。___
A. 增加外汇储备
B. 保有较少总量
C. 投资更多股权
D. 增加资源储备
【单选题】
招商银行于2014年3月24日招标发行国内首款基于信用卡应收账款的资产证券化产品。这种举措在性质上属于银行流动性风险管理中的保持_____流动性的方法。___
A. 资产
B. 负债
C. 资产负债综合
D. 资本
【单选题】
随着市场在资源配置中基础性作用的增强,政府对经济的管理逐步从直接和微观管理向间接和宏观管理转变。与此相适应,我国财政支出重点应逐步从经济建设向_______转变。___
A. 提供公共物品和服务
B. 支持国有经济发展
C. 支持私营经济发展
D. 城市建设
【单选题】
金融风险是指金融机构在货币资金的借贷和经营过程中,由于各种不确定性因素的影响,使得_______发生偏差,从而发生损失的可能性。___
A. 预期利率和实际利率
B. 预期风险和实际风险
C. 预期投入和实际投人
D. 预期收益和实际收益
【单选题】
按照《中国人民银行法》规定,货币政策目标是保持货币币值的稳定,并以此促进__________
A. 物价稳定
B. 充分就业
C. 经济增长
D. 国际收支平衡
【单选题】
基础货币的稳定性表现在__________
A. 原始存款与派生存款可以相互转化
B. 存款货币与通货可以相互转化
C. 库存现金与商业银行在中央银行的存款相对稳定
D. 法定准备率是不可以经常变动的经济变量
【单选题】
在金融衍生品市场上,以风险对冲为主要交易目的的市场参与者是__________
A. 经纪人
B. 投机者
C. 套利者
D. 套期保值者
【单选题】
凯恩斯否定了传统的货币数量论者关于货币数量__________
A. 直接决定商品价格的说法
B. 同商品价格无关的说法
C. 同商品价格同比例变动的说法
D. 同商品价格成反比例变动的说法
【单选题】
当市场价格高于合约的执行价格时,看涨期权的买方会选择__________
A. 执行期权
B. 放弃合约
C. 延长期权
D. 终止期权
【单选题】
一家工商企业拟在金融市场上筹集长期资金,其可以选择的市场是__________
A. 股票市场
B. 同业拆借市场
C. 商业票据市场
D. 回购协议市场
【单选题】
我国建立了多层次的证券市场。其中,设立的目的是服务于高新技术或新兴经济企业的证券市场是__________
A. 代办股份转让市场
B. 主板市场
C. 创业板市场
D. 中小企业板市场
【单选题】
只由卖方提缴保证金,买方无须缴纳保证金,只支付期权费的交易是指__________
A.  期货交易
B.  套期交易
C.  期权交易
D.  现货交易
【单选题】
金融机构的资本包括附属资本和__________
A.  注册资本
B.  核心资本
C. 实收资本
D.  实收货币资本
【单选题】
我国确立的商业银行经营与管理原则强调_______第一。___
A.  安全性
B.  效益性
C.  流动性
D.  稳定性
【单选题】
金融机构在办理转账服务、汇兑和代客支付等业务时,其所承担的职能是__________
A. 支付中介
B. 信用中介
C. 创造信用工具
D. 将货币收入转化为资本
【单选题】
如果某投资者以100元的价格买入债券面值为100元、到期期限为5年、票面利率为5%、每年付息-次的债券,并在持有满-年后以101元的价格卖出,则该投资者的持有期收益率是__________
A. 0.02
B. 0.05
C. 0.06
D. 0.08
【单选题】
按照《中国人民银行法》的规定,中国人民银行__________
A.  可以经营国家黄金外汇储备
B.  可以自办经济实体
C.  可以兼办工商信贷业务
D.  可以兼办政策性银行业务
【单选题】
我国为企业集团成员单位提供财务管理服务的非银行金融机构是__________
A. 财务公司
B. 信托投资公司
C. 小额贷款公司
D. 金融租赁公司
【单选题】
目前,我国商业银行最主要的组织制度是__________
A. 单-银行制度
B. 分支银行制度
C. 持股公司制度
D. 连锁银行制度
【单选题】
在银行业监管中,监管当局对商业银行现场检查的基础是__________
A. 盈利性检查
B. 流动性检查
C. 风险性检查
D. 合规性检查
【单选题】
在一国的外汇市场上,因外汇对本币供不应求,外汇汇率急剧上涨,为稳定外汇汇率,该国应当采取会导致_______的经济政策。___
A.  本国实际利率相对上涨
B.  本国实际收入相对提高
C.  本国物价水平相对上升
D.  本国货币资产的安全性下降
【单选题】
商业银行在资产负债综合管理中,致力于实现资产与负债在期限上的匹配。这是商业银行进行_______管理的举措。___
A. 信用风险
B. 市场风险
C. 操作风险
D. 流动性风险
【单选题】
根据我国2013年1月1日施行的《商业银行资本管理办法(试行)》,我国商业银行的核心-级资本充足率不得低于__________
A. 0.08
B. 0.06
C. 0.05
D. 0.025